# Planning application DZ26A/0148/WEB > Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads, Cherrywood, Dún Laoghaire–Rathdown. Granted (20 Jul 2026). - **Reference:** DZ26A/0148/WEB - **Address:** Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads - **Status:** Granted (20 Jul 2026) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** William Neville & Sons Unlimited Company - **Lodged:** 25 Jun 2026 - **Decided:** 20 Jul 2026 - **Location (lat, lng):** 53.249083, -6.148763 ## Proposal A residential scheme of 311 no. units and a crèche facility in buildings ranging in height from 3 to 6 storeys over partial basement. The residential units will comprise 252 no. apartments, 28 no. duplex units and 31 no. houses. The apartments will be accommodated in 5 no. blocks ranging in height from 4 to 6 storeys (over partial basements) as follows: 1) Block A (6-storeys) will accommodate 48 no. units comprising 7 no. 1-bedroom, 29 no. 2-bedroom and 12 no. 3-bedroom units. 2) Blocks B and C (4 to 6 storeys) will each accommodate 58 no. units comprising 11 no. 1-bedroom, 31 no. 2-bedroom and 16 no. 3-bedroom units. 3)Block D (6-storeys) will accommodate 60 no. units comprising 6 no. 1-bedroom, 42 no. 2-bedroom and 12 no. 3-bedroom units. 4) Block E (4-storeys) will accommodate 28 no. units comprising 5 no. 1-bedroom, 16 no. 2-bedroom and 7 no. 3-bedroom units. Block E will accommodate a Crèche facility at ground floor level. 5) The apartments will have associated private balconies/terraces. The houses and duplex units will be located in 2 housing blocks (labelled A and B). Housing Block A will accommodate 14 no. 2-bedroom duplex units and 14 no. 3-bedroom duplex units in 2 no. 3-storey duplex terraces and 12 no. 4-bedroom 3-storey terraced houses. Housing Block B will accommodate 19 no. 4-bedroom 3-storey terraced houses. Three separate basements are proposed which will accommodate 165 no. car parking spaces, bicycle parking, refuse storage and plant. The development will include 2 no. vehicular accesses from the existing road that serves the adjacent residential development to the north-east, pedestrian access from Grand Parade and Western Courtyard, new internal access roads and footpaths, surface level car parking (127 spaces) and bicycle parking, landscaped amenity spaces, boundary treatments, part of the new landscaped Greenway connecting Tully Park and Lehaunstown Valley and all associated site development works and services. ## In plain English 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - **311** homes - **292** car parking spaces - **6** storeys max ### What's planned A residential scheme of apartments, two-level units and houses over partial basements, with a crèche. ### Residential **252** apartments in **5** blocks of 4–6 storeys, **28** two- and three-bed two-level units, and **31** four-bed three-storey terraced houses. ### Community A crèche on the ground floor of Block E, and part of a new landscaped greenway linking Tully Park and Lehaunstown Valley. ### Transport **165** basement and **127** surface car spaces, plus bicycle parking. Two vehicle entrances from the existing road to the north-east and footpaths to Grand Parade and Western Courtyard. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 4 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, and as clarified by way of Further Information received on 23/06/2026, save as may be required by the other conditions attached hereto. REASON: In the interest of clarity, the proper planning and sustainable development of the area, to ensure that the proposed development is consistent with the Cherrywood Planning Scheme (2014, as amended) and to ensure that effective control can be maintained. ### Condition 5 PART V 2. The applicant/developer shall enter into an agreement in accordance with Part V of the Planning and Development Act, 2000, as amended, prior to commencement of development, unless the applicant/developer shall have applied for and been granted an exemption certificate under section 97 of the Acts. Should a decision be made to grant planning permission for the proposed development, it is important to note that no demolition should take place before the City Valuer has an opportunity to inspect the buildings and development site in its current state. REASON: In the interest of proper planning and sustainable development. ### Condition 6 TAKING IN CHARGE / OWNERS' MANAGEMENT COMPANY 3. Prior to commencement of development, the applicant/developer shall submit, for the written agreement of the Planning Authority, full details of the areas of the permitted development to be taken in charge, if any, and those areas to be maintained by a properly constituted Owners' Management Company. a) The details shall include a layout map clearly identifying the areas to be taken in charge, privately owned areas, areas to be maintained by the Owners' Management Company, and the Greenway and any associated publicly accessible open space / public realm areas. The submitted details shall also set out the proposed management, maintenance and public accessibility arrangements for the Greenway and any associated publicly accessible areas. b) The Owners' Management Company shall be legally constituted and membership shall be compulsory for all purchasers of property in the development. Confirmation that the Owners' Management Company has been established shall be submitted to the Planning Authority prior to the occupation of the first residential unit. Reason: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. ### Condition 7 ISSUE OF TENURE AND INSTITUTIONAL INVESTMENT Section 47 of the Planning and Development Act 2000, as amended 4. With regard to the Regulation of Commercial Institutional Investment in Housing, Guidelines for Planning Authorities, May 2021, the following shall be complied with as regards the issue of tenure: a) Prior to the commencement of any house or duplex unit in the development as permitted, the applicant or any person with an interest in the land shall enter into an agreement with the Planning Authority (such agreement must specify the number and location of each house or duplex unit), pursuant to Section 47 of the Planning and Development Act 2000, that restricts all houses and duplex units permitted, to first occupation by individual purchasers i.e. those not being a corporate entity, and/or by those eligible for the occupation of social and/or affordable housing, including cost rental housing. b) An agreement pursuant to Section 47 shall be applicable for the period of duration of the planning permission, except where after not less than two years from the date of completion of each specified housing unit, it is demonstrated to the satisfaction of the Planning Authority that it has not been possible to transact each specified house or duplex unit for use by individual purchasers and/or to those eligible for the occupation of social and/or affordable housing, including cost rental housing. c) The determination of the Planning Authority, as required in (b), shall be subject to receipt by the planning and housing authority of satisfactory documentary evidence from the applicant or any person with an interest in the land regarding the sales and marketing of the specified housing units, in which case the Planning Authority shall confirm in writing to the applicant or any person with an interest in the land that the Section 47 agreement has been terminated and that the requirement of this planning condition has been discharged in respect of each specified housing unit. Note: For the avoidance of doubt, the definition of 'houses and duplex units' in this condition is as per the definition set out in the Ministerial Planning Guidelines under Section 28 of the Planning and Development Act 2000, as amended, Regulation of Commercial Institutional Investment in Housing, namely: • A house, defined as not including a building designed for use or used as two or more dwellings or a flat, an apartment or other dwelling within such a building, and, • A duplex unit, defined as a dwelling within a building designed for use as two individual dwellings and/or on one shared plot, with separate entrances. REASON: To restrict new housing development to use by persons of a particular class or description in order to ensure an adequate choice and supply of housing, including affordable housing, in the common good. ### Condition 8 5. Prior to the occupation of the hereby permitted development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, the following detailed design drawings: a) Overall site plans in DWG format projected to ITM (Irish Transverse Mercator in metres); b) Ground floor plans of buildings in DWG format (ITM projection in metres); and c) Site sections and elevations in PDF format. REASON: To enable the development to be represented in a G.I.S environment and ensure consistency with Section 7.4 of the Cherrywood Planning Scheme, 2014 (as amended). ### Condition 9 SEQUENCING AND PHASING 6. The Applicant shall complete the section of Grand Parade B to A2 to a Taking In Charge standard for the subject development to be consistent with the Planning Scheme Table 7.3. REASON: In the interests of orderly development and to ensure consistency with Section 7.2.1 of the Planning Scheme. ### Condition 10 MICROCLIMATE 7. Prior to the commencement of development, the Applicant /Developer shall submit, for the written agreement of the Planning Authority, a revised wind assessment and updated drawings to demonstrate the compliance with the Lawson Criteria and include appropriate wind mitigation measures where necessary. REASON: To ensure an appropriate level of wind comfort is achieved, consistent with Objective PD12. ### Condition 11 MATERIALS AND FINISHES 8. Prior to the commencement of development, or as otherwise agreed, the Applicant/Developer shall provide, for the written agreement of the Planning Authority: a) Details of external design/finishes including: windows and doors, balconies, roof services/plant and associated screening, ESB substations/ switch rooms and basement parking entrances all in the form of drawings, plans, elevations, sample photos and on-site mock-ups. The Planning Authority shall be notified when the on-site mocks-ups are available for inspection. b) The external finishes shall include materials that are: • of a high quality, durable, sustainable and attractive, • at ground floor and facing the public realm, comprise of durable and high-quality materials including natural stone or brick, • at rooftop, materials and treatments, including screening, shall be light in colour. • ensure harmony and visual coherence in the built environment. c) The location and details, including materials, of bike stores, bin stores and staging areas, service and meter boxes and other similar ancillary provisions located within the curtilage of development, and to ensure that they do not register as visual clutter. REASON: To ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning. ### Condition 12 ROOF STRUCTURE 9. No additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless authorised by a prior grant of planning permission. REASON: To ensure consistency with Section 2.8.2 and PD 19 of the Cherrywood Planning Scheme and in the interests of visual and residential amenity. ### Condition 13 WAYFINDING AND SIGNAGE 10. Prior to the installation of any signage associated with the proposed development, the Applicant/Developer shall submit for the written agreement of the Planning Authority a Signage and Wayfinding Strategy including: a) Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. b) Street name and numbering in accordance with Objectives H6 and GI 10 and with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. c) Full details of the location and content including background colour, lettering typeface, logos and colour. d) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. ### Condition 14 NOISE AND SENSITIVITY 11. Prior to the commencement of development, the Applicant/Developer shall submit, for the written agreement of the Planning Authority, an updated Noise Impact Assessment, particularly including a noise assessment of the construction phase of the proposed development, on existing residential development, demonstrating consistency with Objective PD 33 of the Planning Scheme. REASON: To ensure consistency with PD 33 of the Cherrywood Planning Scheme, as amended and in the interests of proper planning and sustainable development. ### Condition 15 12. In relation to operational noise impacts, the Applicant/Developer shall implement in full the acoustic design requirements set out in Section 7 'Mitigation Measures & Acoustic Design Strategy of the report submitted as part of the Application-'Mitigation Measures & Acoustic Design Strategy |' prepared by iAcoustics and dated 16/02/2026. REASON: To ensure consistency with Section 2.13 of the Cherrywood Planning Scheme, as amended and in the interests of proper planning and sustainable development. ### Condition 16 PHYSICAL INFRASTRUCTURE CONSTRUCTION MANAGEMENT 13. The Applicant/Developer shall comply with the following: a) Prior to commencement of development, the Applicant/Developer shall submit a final detailed Construction Management Plan (CMP) for the written agreement of the Planning Authority that shall include full details, including engineering layouts as appropriate for the site compound, details of the proposed programme and methodology, working hours, and any proposals for construction phasing. The CMP shall also include full details of the following: • A CEMP (Construction Environmental Management Plan),that fully outlines environmental management measures to be implemented during the construction stage. The CEMP shall align with but not be limited to, measures included in the various documents provided by the applicant including the PCEMP, EcIA, HRA and proposed mitigation measures to avoid high groundwater levels. It shall contain but not be limited to: clear trigger levels and remedial actions to ensure avoidance of any exceedances of applicable environmental effect thresholds; clear protocols for independent environmental compliance auditing; clear protocols to ensure timely reporting and accessibility of audit findings. • A RWMP (Construction & Demolition Resource Waste Management Plan), that details how the RWMP will be measured and monitored throughout the construction stage, as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021). • A SWMP (Surface Water Management Plan), that details appropriate surface water management procedures/measures for the construction stage of the development, in accordance with the requirements of the Planning Authority. • A CTMP (Construction Traffic Management Plan), that details all traffic management measures and signage for the permitted construction access route, as necessary, and details of construction vehicle parking and queueing proposals, noting parking for construction vehicles shall be provided within the site boundary. • A CLP (Community Liaison Plan), including a nominated Project Liaison Officer (PLO) to manage all public relations issues relating to the construction works. • Vibration, Dust & Noise Management Proposals, that demonstrate compliance with industry standards. b) For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Applicant/Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development, to demonstrate how the existing road network is to be maintained to an acceptable standard throughout the construction phase. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 & DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both I. prior to commencement of development and iI. post completion of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc., to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard which is to the satisfaction of the Planning Authority. c) Prior to the commencement of development, the Applicant/Developer shall nominate an individual as Designated Community Liaison Officer (DCLO) for the subject development and shall advise the Planning Authority of this nomination in writing. d) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This should be addressed in the Community Liaison Plan. e) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. f) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. g) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. h) Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. i) A Noise Management Plan shall be developed and implemented demonstrating selection of construction methodology and implementation of mitigation measures to minimise nuisance affecting adjoining properties and design of building services, such as ventilation equipment and ducting, to avoid creation of nuisance affecting adjoining residential areas. j) A plan to accommodate existing LUAS infrastructure to the design, which shall be included as part of the Noise Management Plan. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, and in the interests of orderly development, proper planning and sustainable development. ### Condition 17 CULTURAL AND BUILT HERITAGE 14. Prior to the commencement of any construction works: a) The developer shall engage a suitably qualified archaeologist to monitor (licensed under the National Monuments Acts) all site clearance works, topsoil stripping, and/or groundworks associated with the development. b) Should significant archaeological remains be identified during the course of archaeological monitoring, all works shall cease in the area of archaeological interest pending a decision of the planning authority, in consultation with the Department of Housing, Local Government and Heritage, regarding appropriate mitigation (either in situ or by record). c) The developer shall facilitate the archaeologist in recording any remains identified. Any further archaeological mitigation requirements specified by the planning authority, following consultation with the Department of Housing, Local Government and Heritage, shall be complied with by the developer. d) Any redesign of the permitted development required by the preservation in situ of archaeological artifacts, shall either be agreed in writing with the Planning Authority prior to its construction or shall require a separate grant of permission. e) Following the completion of all archaeological work on site and any necessary post-excavation specialist analysis, the planning authority and (if necessary) the Department of Housing, Local Government and Heritage shall be furnished with a final archaeological report describing the results of the monitoring and any subsequent required archaeological investigative work/excavation required. All resulting and associated archaeological costs shall be borne by the developer. REASON: To ensure consistency with Specific Objective H1 of the Cherrywood SDZ Planning Scheme (2014, as amended) and, in the context of proximate Recorded Monuments, to ensure the continued preservation (either in situ or by record) of places, sites, features or other objects of archaeological interest. ### Condition 18 WATER SUPPLY 15. The Applicant / Developer shall comply with the following: a) The detailed design of the water supply and wastewater infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. The water supply and wastewater infrastructure for the development shall be designed and installed in accordance with Irish Water's overall water supply masterplan for Cherrywood SDZ and Irish Water's standards and codes of practice. The Applicant/Developer's designs shall be consistent with designs permitted under planning reference DZ15A/0758 and the Planning Scheme, or as otherwise agreed with Irish Water. All works on Grand Parade to facilitate new water mains and drainage connections to Irish Water infrastructure shall be undertaken at the Applicant/Developer's sole expense. b) The water supply drawing shall be amended to show water flow direction, which confirms that water supply would be provided from south. Additionally, an amendment to the approved pipe diameter under DZ21A0414 shall be applied. c) The confirmation of feasibility from UE shall be submitted, with prove that all potential actions deemed necessary by UE are incorporated to the design, for both water supply and foul networks. The Applicant/Developer shall sign a connection agreement with Irish Water prior to any works commencing and connecting to their network (water and wastewater). d) Should the Applicant/Developer wish to provide temporary connections for the subject development to existing Irish Water infrastructure, either directly or indirectly, they are required to enter into a separate pre-connection agreement with Irish Water, prior to the commencement of any works on site. e) Provision of the drainage layout for the basements and connection to the foul network considering the effect to Tufa springs, refer to GI61. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. To ensure agreement with Irish Water for the applicant's design proposals and to ensure the adequate provision of water and wastewater. ### Condition 19 SURFACE WATER DRAINAGE 16. Prior to commencement of development the Applicant/ Developer shall, for the written agreement of the Planning Authority, submit the following: a) Confirmation that the additional flow from the subject development has been accounted for in the design of the surface water network under Reg. Ref. DZ21A/0414. b) Resubmission of calculations of the surface water network model, demonstrating that the subject development is not under risk of flooding, allowing for at least 500mm freeboard. c) An updated SuDS drawing, showing the connection of all proposed green and blue roofs to the surface water network and confirming the type and amount of extensive/intensive green/blue roofs proposed. d) Detailed sections of the green and blue roofs, considering the tie-in points with other typically used elements to service green and blue roofs. e) Inclusion of an overflow to the infiltration trench, which is directed towards the greenway, ensuring that the overflow does not reach private amenity areas. f) Confirmation that the northwest attenuation tank location is located outside the greenway 4.00m zone comprising the 2.00m hedgerow planting strip and its 2.00m ecological buffer. REASON: In the interests of proper planning, sustainable development and to ensure consistency with PI 6, PI 10 Section 4.2.7, GI 43 and GI 65 of the Planning Scheme. ### Condition 20 17. The Applicant/ Developer shall, for the written agreement of the Planning Authority, submit the following: a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development and shall outline how the applicant/developer will maintain the runoff rate to 1 l/s/ha for each phase of construction and commissioning of the surface water network. b) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. c) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. ### Condition 21 STREET TREES (SuDS) 18. Prior to commencement the Applicant/ Developer shall provide revised layout drawings for the written agreement with the Planning Authority, addressing the following: a) Provision of additional street trees with cellular storage along internal roads/streets as required by Section 4.2.7 (at the required intervals of no more than every 5no. perpendicular/ 2no. parallel spaces and include street trees at ends of parking bays), Section 5.4.7 and objective GI 44 of the Cherrywood Planning Scheme. b) Updated surface water layout/ SuDS layout drawings showing that all proposed street trees provide cellular storage and are connected to the surface water network. REASON: In the interests of sustainable development and in the interests of consistency with PI10, PI 6, Section 4.2.7 and GI 44 of the Planning Scheme. ### Condition 22 INTERNAL ROADS 19. Internal Roads a) Prior to the commencement of development, the applicant shall provide details of the Home Zone proposed for the cul-de-sac, including layout drawings and sections in accordance with DMURS. b) The applicant shall undertake and provide for the written agreement with the Planning Authority: i. A revised Stage 1 Quality Audit on the revised design (based on the revised bicycle/ car parking layout), which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit for the revised subject development proposals. The audit shall be carried out in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken by the applicant's design team. The Stage 1 Quality Audit reports shall address any and all phased construction and occupation proposals for the development to ensure that any construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. In particular, the independent Cycle Audit shall also address provisions to be made for oversized bikes (e.g. cargo bikes with 2.0m x 3.5m footprints, etc.) and electric bikes, including universal access to all bicycle stores in all apartment blocks. ii. Prior to the commencement of development, the detailed design for the subject development's internal road network, inclusive of engineering cross sections detailing all service ducts, pipes, manholes and service chambers, shall be submitted by the Applicant/Developer for the written approval of the Planning Authority. The internal roads permitted under this planning application shall be constructed in full, inclusive of footpaths on either side with an unobstructed two metre width for pedestrian movement in accordance with the relative cross sections as illustrated under Figure 4.4 of the Planning Scheme where relevant and in accordance with DMURS guidance. iii. Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. iv. For any proposed phased construction/ occupation stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction/ prior to occupation stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational at each construction / occupation phase to allow future residents of this development to safely access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer's expense to safely link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. v. Prior to the final occupation stage of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON: In the interests of orderly and sustainable development; To allow for pedestrian and cycle permeability; and in the interests of consistency with PI 14, Section 4.2.7 and PI 20 of the Cherrywood Planning Scheme. ### Condition 23 PEDESTRIAN PERMEABILITY 20. Prior to commencement of development the Applicant/ Developer shall submit detailed drawings including sections, levels and dimensions of the following for the written agreement with the Planning Authority: a) Updated layout drawings, ensuring an unobstructed footpath width of 2.0m throughout the site, of the proposed pedestrian and cycle linkages, including gradients on proposed paths. b) All proposed external stairs and all proposed pedestrian ramps within the site. REASON: To allow for pedestrian and cycle permeability and in the interests of consistency with PI 14, Section 4.2.7, PI 20 and PI22of the Cherrywood Planning Scheme. ### Condition 24 CAR PARKING 21. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority the following: a) Parking proposal which provides 5no. additional spaces to cater for the resident's car park allocation in accordance with the Residential Car Parking Standards Amendment, Section 4.2.10 - noting that a minimum of 6no. car sharing spaces are required to be provided in addition to the required residential car parking spaces, or as otherwise agreed with the Planning Authority. b) The revised car parking proposal shall ensure that visitor, car sharing and accessible parking spaces are dispersed throughout the site, so that some are available for all residential units, including the duplex units and houses (as current layouts show all visitor, car sharing and accessible spaces in the basement of the apartment blocks). c) Optimised basement design with improved accessibility for wheelchair users/ mobility impaired residents, reducing distances between accessible spaces and lift cores, and provision of shared paths where feasible. The proposed accessible spaces shall be next to shared paths or as otherwise agreed with the Planning Authority. d) Standard vehicle swept path analysis in all basements, proving that the farthest car parking space from each basement entrance can be utilised by a standard vehicle. e) Parking Management Plan which shall ensure that a minimum of one parking space is allocated to all 3-bed apartment and 3-bed (or more) houses/duplex units. The plan shall clearly set out the overall parking management strategy and detail the application of usage charges for 1-bed and 2-bed units and address the potential to implement smart parking measures, etc. - in accordance with Section 4.2.10 (Residential Parking Amendment) of the Cherrywood Planning Scheme. f) A minimum of one EV charging point shall be provided for every five car parking spaces and ducting shall be provided to all remaining car parking spaces to facilitate the future installation of EV charging points and ensure that all parking spaces are future-proofed for electric vehicles. REASON: In the interests of sustainable development and to comply with the requirements of Section 4.2.7,PI 21, GI 61ofthe Cherrywood Planning Scheme. ### Condition 25 BICYCLE PARKING 22. Prior to commencement on site the Applicant/ Developer shall provide a Bicycle Parking Management Strategy, for the written agreement with the Planning Authority, including layout drawing(s) and detailed drawings - according to the Dun Laoghaire Rathdown County Council's 'Standards for Cycle Parking and associated Cycling Facilities for New Developments' and the NTA's 'Cycle Design Manual', addressing the following: a) Long-stay bicycle parking: i. Provision of long-stay bicycle parking for the 31no. houses and 28no. duplex units, ensuring that at least one bicycle parking space is provided per duplex unit/house, plus an additional 20% bike parking spaces to cater for future demand, noting that all long-stay cycle parking shall be covered. • A revised layout drawing shall be provided, noting that long-stay bicycle parking needs to be located no more than 50m of the destination and 50m radii are to be included on the layout to confirm this. • Detailed drawings of any proposed bicycle sheds are to be provided. ii. Provision of long-stay bicycle parking for the 244no. apartments, ensuring that at least one bicycle parking space is provided per unit, plus an additional 20% bike parking spaces to cater for future demand, noting that 268no. spaces are proposed at basement level of the apartment blocks and 293no. shall be provided to include future demand of 20%. Noting that an additional 26no. bike spaces are proposed at surface level (in lockable sheds). b) Short-stay/ visitor bicycle parking The applicant shall ensure that a sufficient no. of short-stay/ visitor spaces, including 20% to cater for future demand) are being provided, addressing the following: • Detailed dimensioned drawings of all bike sheds/ bike parking locations to ensure locations are suitable and provide sufficient clearances. • Ensuring that short-stay spaces are located no more than 25m from main entrances. 25m radii are to be included on the layout. c) Cargo bike footprint: Revised drawings of all bicycle parking stores at basement level and of all other Cargo bike parking locations shall be provided showing the footprint of 2.0m wide x 3.5m long required per cargo sized Sheffield type stand (suitable for 2no. cargo bikes). d) Access to bike storage at basement: Revised drawings confirming the provision of an alternative safe route to access bicycle parking at level -1, preferably via a ramp, or as otherwise agreed with the Planning Authority. e) Creche bicycle Parking: Revised drawings to be provided regarding proposed long-stay and visitor parking for the Creche, ensuring these spaces, particularly the visitor spaces, are located in proximity to entrances and with provision for cargo bike spaces. f) Specifications of any stacked storage (if proposed) shall be provided and included in a Final Bicycle Parking Management Strategy. g) The Cycle Parking Management Strategy shall clearly show how the operation and maintenance for the development's cycle parking will be implemented and managed. REASON: In the interest of proper planning and cyclists' safety and for consistency with PI22 of the Planning Scheme and the current DLR County Development Plan. ### Condition 26 UTILITIES AND TELECOM 23. The detailed design of the electricity supply network shall be agreed (in writing) with ESB Networks/ESBI. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. REASON: In the interests of orderly development; to ensure that designs shall meet with the current and future requirements ESB Networks/ESBI; and to ensure consistency with Section 4.3.1 of the Planning Scheme. ### Condition 27 24. The detailed design of the telecoms network shall be agreed (in writing) with the telecoms providers. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. REASON: In the interests of orderly development; to ensure that designs shall meet with the current and future requirements of the telecoms providers; and to ensure consistency with PI 26 of the Planning Scheme. ### Condition 28 WASTE MANAGEMENT 25. Prior to commencement of development the Applicant/ Developer shall, for the written agreement with the Planning Authority, provide the following: a) Provide missing Appendix A of the OWMP, which contains the calculation for the waste generation. b) Details of transportation of the refuse bins from bin stores to staging areas and collection arrangements to ensure all bin staging areas are of sufficient size and do not create a traffic hazard. REASON: In the interests of clarity, traffic and road safety and to ensure consistency with objective PI 32 of the Cherrywood Planning Scheme. ### Condition 29 GREEN INFRASTRUCTURE LANDSCAPE DESIGN 26. The Applicant/Developer shall engage a qualified Landscape Architect as his/her Landscape Consultant throughout the course of the development works, to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. REASON: To ensure ahigh-quality Public Realm, to ensure consistency with the Cherrywood Planning Scheme (as amended) and in the interest of proper planning and sustainable development of the area. ### Condition 30 27. Prior to commencement of development of the residential or landscape/public realm development, whichever comes sooner, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) Landscape Masterplan and other relevant drawings all at an appropriate scale including cross-sections and appropriate elevations. b) Hard landscape plans, construction details and maintenance plans for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), and proposed street furniture, detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held, on-site at all times. All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining developments. REASON: To ensure consistency with the Cherrywood Planning Scheme (as amended) and Specific Objectives PD 14 and GI 7. ### Condition 31 28. Prior to the commencement of development, Applicant/Developer shall submit for the written agreement of the Planning Authority the following: A strategy and landscape plan for the public realm which includes the details of the locations for all vents which are visible within the public and communal spaces. Details to include sections. Vents shall be integrated sensitively and appropriately into the surrounding landscape having regard for maintenance, public safety and visual appearance. REASON: To ensure consistency with Specific Objective GI 7 of the Cherrywood Planning Scheme (as amended). ### Condition 32 TREES AND HEDGEROWS 29. Prior to the submission of the Commencement Notice within the meaning of Part II of the Building Control Regulations 1997 (as amended) and prior to the commencement of any works on site, a) The Applicant/Developer shall engage the services of a qualified Arborist as an Arboricultural Consultant, prior to and for the entire period of construction activity. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. b) The Applicant/Developer shall implement all the recommendations pertaining to tree and hedgerow retention, tree and hedgerow protection and tree and hedgerow works, as detailed in the proposals submitted at application stage prepared by Lawlor Landscapes, i.e. tree survey drawing and tree survey report and arboricultural impact assessment (dated November 2025), noting existing hedgerow (G003) on the north-eastern boundary can no longer be retained. The applicant shall ensure tree protection fencing, for adjacent trees/hedgerow along the greenway required to be retained by the Planning Scheme, is provided to the standard detailed in the proposals. c) All works on retained trees shall comply with proper arboricultural techniques conforming to BS 3998:2010 Tree Work - Recommendations. The clearance of any vegetation including trees and scrub shall be carried out outside the bird-breeding season (1st day of March to the 31st day of August inclusive) or as stipulated under the Wildlife Acts 1976 and 2000. d) Where it is feasible to translocate greenway hedgerow and Category B oak trees, translocation shall be prior agreed with DLRCC Parks. e) At Practical Completion of the development, the Consultant shall carry out a Post-Construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. REASON: To ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme (as amended) and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. ### Condition 33 BIODIVERSITY 30. a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Ecologist as an Ecological Consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. b) The Ecological Consultant shall ensure the implementation of Section 5.3 (Mitigation Measures) and Section 5.4 (Evaluation of Mitigation Measures) of the submitted Ecological Impact Assessment and prepare and implement a Habitat Management Plan that accords with the ECIA recommendations, The Landscape Design Rational Report and the Hydrogeological Risk Assessment (Steve Buss, June 2026). REASON: To ensure consistency with BP 03 of the Cherrywood Biodiversity Plan and objective GI 43. ### Condition 34 31. Prior to the commencement of landscape development, the Applicant/Developer shall submit for the written agreement of the Planning Authority: a) Details of Soft Landscape Design to include detailed Planting Plan(s) and Planting Schedule, as appropriate, stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or as otherwise agreed. This shall include a landscape management plan for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. This plan shall align with relevant details provided in documents provided by the Applicant including the EcIA and Landscape Design Rationale Report. b) Planting details to be provided for the swale that demonstrates biodiversity. REASON: To ensure consistency with Specific Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme (as amended). ### Condition 35 32. The Applicant/Developer shall ensure that: a) New hedgerows shall take the form of a continuous double staggered line of native tree and shrub species within a 2m planted strip, together with a 2m ecological buffer, considering the translocation of existing hedgerows and their seed banks to new locations where feasible, in accordance with BP12 of the Cherrywood Biodiversity Plan. The 2m continuous planting strip shall be provided on both sides of the greenway and shall be uninterrupted for its full length. The two proposed future access points should be omitted from the landscape proposals. These locations are identified as 'future connection to Parade Green' and 'future connection to Green Corridor' on the submitted Landscape Masterplan (Dwg. No. 25206 CSR DR 2 0100, Rev F). b) Public lighting to be shown on Landscape plans to demonstrate no conflicts with trees. c) Native grassland species will be planted that are appropriate to the soil chemistry and the function of the grassland, using local soil and seed from local seed harvesting, in accordance with BP 13 of the Cherrywood Biodiversity Plan. REASON: To ensure consistency with Specific Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme (as amended). ### Condition 36 PLAY 33. a) Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: Final design details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1 (Playful Space and Natural Play), 4.7.2 (Play Map), and 4.7.3 (Play Matrices) of the Amenity Space Guidance Document. b) Upon completion of all proposed play spaces and prior to the occupation of residential units, the following shall be submitted for the written agreement of the Planning Authority: A play map in CAD or GIS format, to the Irish Transverse Mercator projection in metres, which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. REASON: To ensure the provision and construction of safe, quality play amenities provision in compliance with Section 5.6 (Play), Specific Objectives GI 71 to GI 73 of the Cherrywood Planning Scheme (as amended) and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. ### Condition 37 34. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority: Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space, having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site and harmonise with and complement adjoining development. Include where relevant sections & elevations clearly indicating the location, specification, type & height of all proposed edge restraints, structures, boundary treatments and gates in accordance with GI 76 of the Cherrywood Planning Scheme. REASON: To ensure consistency with Specific Objective GI 8, GI 11, GI 76 and PD 14 of the Cherrywood Planning Scheme (as amended). ### Condition 38 CONTRIBUTIONS Countywide Surface Water 35. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €43,399.56 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. ### Condition 39 Countywide Transport Infrastructure 36. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €650,982.93 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 40 Countywide Community & Parks Facilities & Recreational Amenities 37. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €3,645,465.52 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 41 Cherrywood Condition 38. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €5,572,757.82 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 42 BONDS 39. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €999,100.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €619,400.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. ### Condition 43 40. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. ## Nearby applications - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [D18A/0590](https://cherrywoodplans.com/application/D18A-0590.md): The Pines, Lehaunstown Lane, Cabinteely, Dublin 18, D18 E3X7. Granted (11 Sep 2018). Replaces a septic tank with a modern wastewater treatment system at The Pines, Lehaunstown Lane. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ26A-0148-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/105047) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._