# Planning application DZ26A/0151/WEB > In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18., Cherrywood, Dún Laoghaire–Rathdown. Granted (24 Jun 2026). - **Reference:** DZ26A/0151/WEB - **Address:** In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. - **Status:** Granted (24 Jun 2026) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** LSREF V Eden TC6 Limited - **Lodged:** 28 May 2026 - **Decided:** 24 Jun 2026 - **Location (lat, lng):** 53.246207, -6.151821 ## Proposal 188no. residential units in a mixture of houses, duplexes and apartments. The overall development proposed comprises the following: 80no. apartments accommodated in 2no. blocks up to 5 storeys in height. Block A includes 40no. units (28no. 1-bedroom and 12no. 2-bedroom) with balconies/terraces and Block B accommodates 40no. units (29no. 1-bedroom and 11no. 2-bedroom) with balconies/terraces. 88no. 3 storey duplex units (25no. 1-bedroom, 29no. 2-bedroom and 34no. 3-bedroom). 20no. 3 storey 4-bedroom houses. All associated and ancillary site development and infrastructural works, car and cycle parking, drainage, hard and soft landscaping, communal and private open space, bin stores, ESB substations, bike stores and mobility hubs. Vehicular Access is provided from a single existing access point from Bishop Street. The proposed development consists of revisions/modifications to approximately 0.75ha of the works permitted at the Tully Park development (permitted pursuant to Reg Ref DZ15A/0813, as extended by DZ15A/0813/E and amended by Reg Ref DZ17A/0714, Reg Ref DZ17A/0862, Reg Ref DZ18A/0458 and Reg. Ref. DZ20A/0946) comprising the: Modification and relocation of the Level 5 local neighbourhood road along boundary with Tully Park immediately adjoining the development; The inclusion of a Part M compliant footpath in the Greenway located alongside the permitted Cherrywood Square / Tully Park Link Access Route linking Bishop Street with Tully Park; Amendment to entrance details at Tully Park Entrances. Tully Park itself is not affected by the development being proposed. No works are proposed to or in the vicinity of Tully Church Graveyard or within its grounds (Ref: DU026023001-2; National Monument No. 225) or to the National Monument including the high crosses (Ref: DU026023003, 4, 7: National Monument No.216). The planning application may be inspected or purchased for a fee not exceeding a reasonable cost of making a copy, at the offices of the Planning Authority, Marine Road, Dún Laoghaire, Co. Dublin, during its public opening hours of Monday to Friday from 10:00am to 4:00pm. A submission or observation in relation to the application may be made in writing to the Planning Authority, on payment of a fee of €20 within 5 weeks of receipt of the application by the Planning Authority and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions or may refuse to grant permission. ## In plain English 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - **188** homes - **5** storeys max ### What's planned A residential scheme on the TC6 site in Development Area 2 (Cherrywood), between Bishop Street and Tully Park. ### Residential **80** apartments in **2** blocks up to 5 storeys (**57** one-bed, **23** two-bed), **88** three-storey two-level units (**25** one-bed, **29** two-bed, **34** three-bed) and **20** three-storey four-bed houses. ### Transport A single vehicle access from Bishop Street, a relocated local road along Tully Park, an accessible footpath on the greenway, and mobility hubs. ### Heritage No works are proposed near Tully Church graveyard or its high crosses, which are national monuments. Tully Park itself is not affected. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, and as clarified by way of Further Information received on 28/05/2026, save as may be required by the other conditions attached hereto. REASON: In the interest of clarity, the proper planning and sustainable development of the area, to ensure that the proposed development is consistent with the Cherrywood Planning Scheme (2014, as amended) and to ensure that that effective control can be maintained. ### Condition 2 2. Save for amendments granted on foot of this permission and the requirements of other conditions attached hereto, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission granted under Reg. Ref. DZ15A/0813, as extended by DZ15A/0813/E and amended by Reg. Ref. DZ17A/0714, Reg. Ref. DZ17A/0862, Reg. Ref. DZ18A/0458 and Reg. Ref. DZ20A/0946). REASON: In the interest of clarity, to ensure that the amended development adheres to the conditions attached to the previous parent and amendment permissions and maintains consistency with the Cherrywood Planning Scheme (2014, as amended). ### Condition 3 3. Public Lighting Prior to commencement of development the applicant shall submit all details regarding Public Lighting to the Planning Authority for written approval. NOTE : DLR Public Lighting will not be taking handrail lights (E&F) in charge. REASON: In the interest of proper planning and sustainable development. ### Condition 4 4. Part V The applicant/developer shall enter into an agreement in accordance with Part V of the Planning and Development Act, 2000, as amended, prior to commencement, unless the applicant/developer shall have applied for and been granted an exemption certificate under section 97 of the Acts. Should a decision be made to grant planning permission for the proposed development, it is important to note that no demolition should take place before the City Valuer has an opportunity to inspect the buildings and development site in its current state. REASON: In the interest of proper planning and sustainable development. ### Condition 5 5. Building Control (a). Unless otherwise directed by a Planning Permission condition, the Applicant shall provide the following in due course: • A Certificate of Incorporation of a legally constituted Owners Management Company, • Memorandum and articles of Association (Constitution) of the Owners Management Company with reference made to the Multi Unit Development Act 2011. • A site plan showing clear delineation of the areas under the ownership/charge of the owners' management company, privately owned area and areas proposed for Taking in Charge by the Council, as applicable. All underground services and external lighting columns/fixtures shall also be shown on this drawing. • A management scheme providing adequate measures for the future maintenance of roads and communal areas. • An expectant date at which the certification of incorporation will be submitted, and which shall be before the first resident is moved into the first residential dwelling of the development. (b). Taking in Charge Area(s) The areas within the development been offered for Taking-In-Charge and the areas that shall be the responsibility of the Owners Management Company shall comply with Dun Laoghaire Rathdown County Council's [DLRCC] requirements and which shall include compliance with the following documents: • Taking In Charge Policy for Residential Developments May 2022(as amended) & • Taking In Charge Development Standards Guidance Document June 2022(as amended). REASON: In the interest of proper planning and sustainable development. ### Condition 6 6. Environmental Health (a). During the construction phase all reasonable measures shall be taken to reduce potential impacts relating to noise nuisance and disturbance and vibrational impacts to an acceptable level. Noise levels shall be controlled and monitored to ensure that site construction activities do not have an adverse or unacceptable impact on local receptors, adjacent property, adjacent users and human health and on the wider receiving environment. (b). Site development and building works shall be restricted to: 7.00am to 7.00pm Monday to Friday 8.00am to 2.00pm Saturday No works allowed Sunday or Bank Holidays Any works/activity outside of these stated hours must have prior approval from DLRCC planning department. (c). A programme of noise and vibration monitoring shall be in place prior to the commencement of any construction activity. It shall be carried out for the duration of the development, along the site boundary/ noise sensitive location(s) by an appropriately qualified and experienced acoustic technician. Should any noise assessment identify the noise limits being exceeded, further investigation will be carried out and mitigation measures implemented to ensure compliance. Copies of the monitoring shall be made available to the Environmental Health Service's Air & Noise Unit upon request. (d). A programme of dust monitoring shall be carried out by the developer at dust sensitive locations adjacent to the site boundaries and shall be made available to the local authority on an agreed basis and/or on request. Set up monitoring points at any dust sensitive locations to measure total dust deposition rates. The amount of dust deposited anywhere outside the proposed development, when averaged over a 30-day period, should not exceed: • 130mg/m2 per day when measured according to the BS method which takes account of insoluble components only, or • 350mg/m2 per day when measured according to TA Luft, which includes both soluble and insoluble matter. (EPA compliance monitoring is based on the TA Luft method). (e). A Public Liaison Plan shall be developed and implemented for the duration of the works. A community Liaison Officer shall be appointed as a single point of contact to engage with the local community and respond to concerns. Local residents shall be informed of progress and timing of significant construction activities that may impact on them. A notice at the site entrance will identify the proposed means for making a complaint and a complaints log recording all complaints received and follow up actions will be kept for review by this office upon request. (f). Due consideration shall be given to the location and orientation of any plant equipment such as air conditioning units, to ensure there are no significant impacts on the background noise levels at any nearby noise sensitive locations. Where necessary external plant equipment shall be fitted with acoustic baffles/enclosures. The rated noise levels from plant equipment during the operational phase of the proposed development shall not constitute reasonable grounds for complaints provided for in BS 4142 Methods for rating industrial and commercial noise. Clearly audible and impulsive tones at noise sensitive locations during evening and night shall be avoided irrespective of the noise level. REASON: In the interest of proper planning and sustainable development and in the interest of environmental health. ### Condition 7 7. Archaeology (a). The developer shall engage a suitably qualified archaeologist to monitor (licensed under the National Monuments Acts) all site clearance works, topsoil stripping, and/or groundworks associated with the development within the remaining greenfield area of the development site only. The use of appropriate machinery to ensure the preservation and recording of any surviving archaeological remains shall be necessary. (b). The method statement for the archaeological monitoring shall include methodology for the preservation by record of the pit that was identified during archaeological testing under Licence 21E0257. (c). Should archaeological remains be identified during the course of archaeological monitoring, all works shall cease in the area of archaeological interest pending a decision of the planning authority, in consultation with the Department of Housing, Local Government and Heritage, regarding appropriate mitigation [preservation insitu/ excavation]. (d). The developer shall facilitate the archaeologist in recording any remains identified. Any further archaeological mitigation requirements specified by the planning authority, following consultation with the Department of Housing, Local Government and Heritage, shall be complied with by the developer. (e). Following the completion of all archaeological work on site and any necessary post-excavation specialist analysis, the planning authority and the Department of Housing, Local Government and Heritage shall be furnished with a final archaeological report describing the results of the monitoring and any subsequent required archaeological investigative work/excavation required. All resulting and associated archaeological costs shall be borne by the developer. REASON: In the interest of proper planning and sustainable development and in the interest of archaeology. ### Condition 8 8. Prior to the completion of development, the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: - Overall site plans in DWG format (ITM projection in metres) - Ground floor plans of buildings in DWG format (ITM projection in metres) - Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. ### Condition 9 9. Prior to the commencement of development, the Applicant /Developer shall submit, for the written agreement of the Planning Authority, the following; - A revised wind assessment and updated drawings which include appropriate wind mitigation measures and demonstrates the achievement of acceptable sitting conditions for the private amenity balconies on the western and southern façades of Apartment Block A, and the balconies/terraces on the southern façade of the Bishop Street duplexes, in accordance with the Lawson Criteria. - Revised wind assessment and drawings, including landscaping drawings and planting plans, which include appropriate wind mitigation measures, and demonstrates the achievement of acceptable sitting conditions for the western 'Play Area'. REASON: To ensure an appropriate level of wind comfort is achieved, consistent with Objective PD 12. ### Condition 10 10. Prior to the commencement of development, or as otherwise agreed, the Applicant/ Developer shall provide, for the written agreement of the Planning Authority: a) Details of external design/finishes including: windows and doors, balconies, roof services/ plant and associated screening, ESB substations/ switch rooms, all in the form of drawings, plans, elevations, sample photos and on-site mock-ups. The Planning Authority shall be notified when the on-site mocks-ups are available for inspection. b) The external finishes shall include materials that are: • of a high quality, durable, sustainable and attractive, • at ground floor and facing the public realm, comprise of durable and high-quality materials including natural stone or brick, • at rooftop, materials and treatments, including screening, shall be light in colour. • ensure harmony and visual coherence in the built environment. c) A Public Realm Strategy including the location and details, including materials, of bike stores, bin stores and staging areas, service and meter boxes, bollards and other similar ancillary provisions located within the curtilage of development, ensuring they act as a positive design feature that enhances the local streetscape and do not register as visual clutter. REASON: To ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning Scheme. ### Condition 11 11. Prior to the commencement of development the applicant shall submit, for the written agreement of the Planning Authority, revised drawings which show the design details of the roof structures, including the details of the height and scale and materials of the lift over runs. In this design particular regard shall be had to ensure: a) External finishes shall be light in colour and blend with the external finishes of the building façade and shall be included in any required mock-ups/samples of materials to be provided by way of compliance with related conditions. b) No additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless otherwise approved by way of this condition. REASON: To ensure consistency with Section 2.8.2 and PD 19 of the Cherrywood planning Scheme and in the interests of visual and residential amenity. ### Condition 12 12. Prior to the installation of any signage associated with the proposed development, the developer shall submit for the written agreement of the Planning Authority a Signage Strategy including: a) Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021 and shall be agreed in writing with the Planning Authority. b) Street name and numbering in accordance with H6 and GI 10. c) Full details of the location and content including background colour, lettering typeface, logos and colour d) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. ### Condition 13 CONSTRUCTION MANAGEMENT 13. The Applicant/Developer shall comply with the following: a) Prior to commencement of development, the Applicant/Developer shall submit a final detailed Construction Management Plan (CMP) for the written agreement of the Planning Authority that shall include full details, including engineering layouts as appropriate for the site compound, details of the proposed programme and methodology, working hours, and any proposals for construction phasing. The CMP shall also include full details of the following: • A CEMP (Construction Environmental Management Plan), that fully outlines environmental management measures to be implemented during the construction stage. The CEMP shall align with, but not be limited to, measures included in the various documents provided by the applicant including the PCEMP and EcIA. It shall contain, but not be limited to clear: trigger levels and remedial actions to ensure avoidance of any exceedances of applicable environmental effect thresholds; protocols for independent environmental compliance auditing; protocols to ensure timely reporting and accessibility of audit findings. Evidence of development in consultation with the relevant reiver authority or fisheries board shall be provided. • A RWMP (Construction & Demolition Resource Waste Management Plan), that details how the RWMP will be measured and monitored throughout the construction stage, as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021). • A SWMP (Surface Water Management Plan), that details appropriate surface water management procedures/measures for the construction stage of the development, in accordance with the requirements of the Planning Authority. • A CTMP (Construction Traffic Management Plan), that details all traffic management measures and signage for the permitted construction access route, including all the safety implications arising from the Beckett Road construction, as necessary, and details of construction vehicle parking and queueing proposals, noting parking for construction vehicles shall be provided within the site boundary. • A CLP (Community Liaison Plan), including a nominated Project Liaison Officer (PLO) to manage all public relations issues relating to the construction works. • Vibration, Dust & Noise Management Proposals, that demonstrate compliance with industry standards. • The phasing of development shall be in accordance with the applicant's PCEMP construction phasing plan dated 21 May 2026, or as otherwise agreed by the Planning Authority. • For clarity, Tully Park Universal Access Link shall be constructed in Phase 0 as per Section 2.3 of the applicant's submitted PCEMP Construction Phasing Plan, or as otherwise agreed with the Planning Authority. • Any alternative site compound location for the proposed construction phases shall be agreed with the Planning Authority. b) For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Applicant/Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development, to demonstrate how the existing road network is to be maintained to an acceptable standard throughout the construction phase. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 & DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both i. prior to commencement of development and ii. post completion of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard which is to the satisfaction of the Planning Authority. c) Prior to the commencement of development, the Applicant/Developer shall nominate an individual as Designated Community Liaison Officer (DCLO) for the subject development and shall advise the Planning Authority of this nomination in writing. d) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This should be addressed in the Community Liaison Plan. e) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. f) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. g) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. h) Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. i) A Noise Management Plan shall be developed and implemented demonstrating selection of construction methodology and implementation of mitigation measures to minimise nuisance affecting adjoining properties and design of building services, such as ventilation equipment and ducting, to avoid creation of nuisance affecting adjoining residential areas. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, and in the interests of orderly development, proper planning and sustainable development. ### Condition 14 CULTURAL & BUILT HERITAGE 14. Prior to the commencement of any construction works, a) The Applicant shall engage the services of a suitably qualified archaeologist to carry out archaeological monitoring at the development site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. b) Should significant archaeological features be found, any works which would affect them shall cease pending agreement with the National Monument Service as to how they are to be dealt with. c) Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the National Monuments Service of the Department of Culture, Heritage and the Gaeltacht. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required, and this shall be agreed with the National Monuments Service. d) All remaining topsoil stripping associated with the proposed development shall be monitored by a suitably qualified archaeologist and works should include a programme of metal detection which will require a licence from the National Monuments Service of the DoHLGH. e) The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of any site preparations. This will allow the archaeologist sufficient time to obtain a licence to carry out the work. f) The archaeologist shall excavate additional test trenches, if necessary, at locations chosen by the archaeologist (licensed under the National Monuments Act, 1930, as amended) having consulted the site drawings and geophysical survey results. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest and to ensure that the proposed development is consistent with Section 3.2.4 of the Planning Scheme. ### Condition 15 PHYSICAL INFRASTRUCTURE: WATER SUPPLY 15. The Applicant / Developer shall comply with the following: The detailed design of the water supply and wastewater infrastructure including details of all connections shall be in accordance with Uisce Eireann specification and requirements. The water supply and wastewater infrastructure for the development shall be designed and installed in accordance with Uisce Eireann's overall water supply masterplan for Cherrywood SDZ and Uisce Eireann's standards and codes of practice. The Applicant/Developer's designs shall be consistent with designs permitted under planning reference DZ15A/0758 and the Planning Scheme, or as otherwise agreed with Uisce Eireann. All works on Bishop Street to facilitate new water mains and drainage connections to Uisce Eireann infrastructure shall be undertaken at the Applicant/Developer's sole expense. a) The Applicant/Developer shall sign a connection agreement with Uisce Eireann prior to any works commencing and connecting to their network (water and wastewater). b) Should the Applicant/Developer wish to provide temporary connections for the subject development to existing Uisce Eireann infrastructure, either directly or indirectly, they are required to enter into a separate pre-connection agreement with Uisce Eireann, prior to the commencement of any works on site. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. To ensure agreement with Uisce Eireann for the applicant's design proposals and to ensure the adequate provision of water and wastewater. ### Condition 16 SURFACE WATER DRAINAGE 16. The Applicant / Developer shall comply with the following: a) The applicant shall align drawings across all disciplines, ensuring that the locations of all proposed SuDS measures are consistent in all drawings. b) A construction method which protects against root compaction shall be used for all proposed cellular tree pits located next to the bin staging areas. c) Revised SuDS drawings shall be submitted which provide missing bioretention tree pits along car park spaces at the correct maximum intervals including extremes, connected to the surface water network. Refer to related condition under GI 65. d) Calculations shall be provided including a permeability coefficient that resembles the existing ground conditions of the TC6 site. e) Revised SuDS drawings which show the connection of northern bio-retention areas to the surface water network shall be submitted. f) The proposed attenuation tanks shall exclusively serve either the residential area of the subject development or Tully Park, avoiding a mixture between residential and Tully Park runoffs towards the same attenuation tank. REASON: In the interests of sustainable development and in the interests of consistency with PI 6, Section 4.2.7 and GI 65 of the Planning Scheme. ### Condition 20 17. The Applicant / Developer shall provide the following: a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development and shall outline how the applicant/developer will maintain the runoff rate to 1 l/s/ha for each phase of construction and commissioning of the surface water network. b) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. c) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. ### Condition 18 TRANSPORTATION 18. To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an annual basis. This review should include updated annual travel surveys of resident's mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time that Roads Phase 1 is complete, taken in charge and operational. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. ### Condition 19 19. The Applicant / Developer shall comply with the following: a) A revised Stage 1 Quality Audit (incorporating an access, cycling, walking and road safety audit), which shall include the area where the Tully Park Universal Access Ramp is planned to be constructed. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 1 Quality Audit report is to address any and all phased construction and occupation proposals for the development to ensure that any construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. b) Prior to the commencement of development, the detailed design for the subject development's internal road network, inclusive of engineering cross sections detailing all service ducts, pipes, manholes and service chambers, shall be submitted by the Applicant/Developer for the written approval of the Planning Authority. This detail design shall include the dimensions of access road, ramps and stairs, demonstrating that an unobstructed width of 2m is achieved at all locations. The internal roads permitted under this planning application shall be constructed in full, inclusive of footpaths on either side with an unobstructed two metre width for pedestrian movement in accordance with the relative cross sections as illustrated under Figure 4.4 of the Planning Scheme where relevant and in accordance with DMURS guidance. c) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. d) For any proposed phased construction/ occupation stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction/ prior to occupation stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational at each construction / occupation phase to allow future residents of this development to safely access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer's expense to safely link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. e) Prior to the final occupation stage of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON:In the interests of orderly and sustainable development; To allow for pedestrian and cycle permeability; and in the interests of consistency with PI 14, Section 4.2.7 and PI 20of the Cherrywood Planning Scheme. ### Condition 20 PEDESTRIAN AND CYCLE MOVEMENT 20. Prior to commencement on site, the applicant/ developer shall provide detailed drawings (layouts, sections, details as required) regarding the following proposed structures, which shall be fully dimensioned and include levels, gradient and sections, for the approval of the Local Authority, to ensure universal access, where applicable: a) Tully Park Universal Access Ramp, including related SuDS measures - refer to related conditions under PI 6 and Section 4.2.7. b) The proposed access ramp/ stairs to the East of Apartment Block B towards Bishop Street, c) Any other stairs connecting the central green area to Bishop Street - including proposed railing, planting, etc. d) Ramps/ stairs within the central green communal area. REASON: To allow for pedestrian and cycle permeability and in the interests of consistency with PI 14, Section 4.2.7 and PI 20of the Cherrywood Planning Scheme. ### Condition 21 CAR PARKING 21. Prior to the commencement of the Development the applicant/developer shall provide: a) A final Car Parking Management Strategy with revised layout drawings which clearly detail the layout of car parking provision in the subject development. • The revised layout drawings shall clearly detail the adequate provision of car parking spaces at surface level, including accessible car parking spaces, electric vehicle car parking spaces, and car sharing spaces for the subject development in accordance with the requirements of the Cherrywood Planning Scheme and the requirements of the DLRCC County Development Plan 2022-2028. • The allocation of specific car parking spaces to individual 3-bed units shall be clearly indicated on a carparking layout drawing. • In addition, allocation of carparking spaces to particular blocks (apartment blocks, duplex blocks) shall also be indicated for all other spaces (for all 1-bed and 2-bed units), including full details for the operation, monitoring and usage charging or otherwise to be implemented for same. • a consideration of potential smart parking measures for the subject development and full details on how any adopted smart parking measures are to be implemented and managed. • A demonstration that future repurposing of car parking provision in the development is feasible in the event of future reductions in car parking provision. b) A parking layout drawing which also detail proposals of allocation of car parking spaces in the subject development to individual apartment blocks/ duplex terraces. The applicant shall ensure (in addition to all fully functioning EV charging spaces) that ducting is provided for every parking space, as per the requirements of Section 12.4.11 of DLRCC's County Development Plan 2022 - 2028. The applicant shall further ensure that charger facilities do l not reduce the unobstructed width of the footpaths to less than 2m. c) A minimum of one car parking space per five car parking spaces should be equipped with one fully functional EV Charging Point. Ducting for every car parking space shall also be provided. REASON:In the interests of sustainable development and to comply with the requirements of PI 21 of the Cherrywood Planning Scheme. ### Condition 22 BICYCLE PARKING/ MOTORBIKE PARKING 22. Prior to commencement on site, the Applicant/ Developer shall provide the following, for the approval by the Planning Authority: a) The applicant/developer shall provide drawings detailing the final layout and quantity of the short-term and long stay cycle parking spaces prior to the commencement of development or as otherwise agreed with the Planning Authority. The Applicant/Developer shall prepare a Cycle Parking Management Strategy for the development for the written agreement of the Planning Authority. This cycle parking management strategy shall include a comprehensive cycle parking operation and monitoring regime which clearly shows how the operation and maintenance for the development's cycle parking (including the proposed e-scooter parking/ charging within the 2no. Mobility Hubs) will be implemented and managed, including routine and annual maintenance of the stacked cycle parking, and how demand for cycle parking will be monitored. This cycle parking management strategy shall also outline how provisions for future demand will be implemented if required. The applicant/developer should have regard to the cycle parking requirements of the NTA national cycle manual and the design standard for new apartments in relation to the proposed bicycle parking provision. b) Long-stay spaces for the Duplex units: for the written agreement of the planning authority, a revised cycle parking layout ensuring that that all long-stay cycle parking spaces for the duplex units are located in secured bike sheds, which are easily accessed, well-lit and covered. The proposed solution may use stacked bicycle storage, and efficiently use the site contours/ site topography to minimise visual impact and impact on communal open space. They should be situated within 50m of all destinations as per DLR 'Standards for Bicycle Parking and associated Facilities for New Developments'. All long-stay bike parking must be covered and all bike parking (including visitor parking) shall provide for safe locking of frame and wheels (stacked storage, Sheffield stands or similar and approved). c) Additional short-stay spaces dispersed throughout the site, to ensure that visitor parking is available within circa 25m of all units, in particular all duplex units. d) Detailed drawings (including dimensions) of all bike parking locations, including all short term/ visitor parking spaces, to ensure sufficient space is provided, including clearance around all bike parking locations to ensure that all spaces are easily accessible. e) The applicant shall provide bike parking (short stay and long stay spaces) to cater for future demand of about 20% above the minimum required residential bike parking required or as otherwise agreed with the Planning Authority, and clearly highlight which spaces are intended to cater for future demand. f) The applicant shall ensure that layouts of all disciplines match and show all proposed bicycle parking and motorbike parking spaces. REASON: To ensure adequate cycle parking and motorbike parking provision for future residents and in the interests of consistency with PI 22 of the Cherrywood Planning Scheme. ### Condition 23 UTILITIES & TELECOM 23. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul and public lighting infrastructure to ensure access for future operation and maintenance activities as may be required. a) The detailed design of the electricity supply infrastructure for the development shall be agreed (in writing) with ESB Networks/ESBI. b) Any upgrade works and subsequent reinstatement works to existing Cherrywood common infrastructure as proposed by the subject application will be at the Applicant/Developer's expense. All reinstatement works to existing Cherrywood common infrastructure shall accord with permitted infrastructure designs under DZ15A/0758. An independent monitoring engineer shall oversee any upgrade and utility connection works to Cherrywood Common Infrastructure. REASON: In the interests of orderly development, the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway, and to ensure that designs shall meet with the current and future requirements ESB Networks/ESBI and to ensure consistency with Section 4.3.1 of the Planning Scheme. ### Condition 24 24. The telecom services detailed design layout shall be provided, considering and avoiding clashes with other urban elements and trees. a) Such detailed design of the telecoms network for the development shall be agreed (in writing) with the telecom providers. REASON: In the interests of orderly development, the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; To ensure that designs shall meet with the current and future requirements of the telecom providers, and to ensure consistency with PI 26 of the Planning Scheme. ### Condition 25 WASTE MANAGEMENT 25. The Applicant / Developer shall comply with the following: a) The subject development's bin staging areas shall be located to ensure routes from/ to the proposed internal bin stores are optimised (in particular for Bin Store D) to ensure ease of access, via short and safe routes. The Applicant / Developer shall ensure that the permitted bin staging areas are sufficiently sized for the number of bins required on collection day(s). b) The subject development shall be operated in accordance with a final Operational Waste Management Plan (OWMP) and the Applicant/Developer shall ensure that the measures outlined within the Plan are fully implemented to ensure suitable management of waste storage areas and collection operations. c) An updated waste management layout drawing shall clearly indicate and name all proposed bin stores and corresponding bin staging areas. d) The OWMP shall include swept path analysis for a standard size refuse collection vehicle, for the proposed routes and stopping locations for collection, to ensure that no overruns occur. REASON: In the interests of clarity, traffic and road safety and to ensure consistency with objective PI 32 of the Cherrywood Planning Scheme. ### Condition 26 GREEN INFRASTRUCTURE LANDSCAPE DESIGN 26. The Applicant/Developer shall engage a qualified Landscape Architect as his/her Landscape Consultant throughout the course of the development works, to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. REASON: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. ### Condition 27 27. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) A Landscape Masterplan and other relevant drawings all at an appropriate scale including cross-sections and appropriate elevations. b) Hard landscape plans and construction details for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces) and proposed street furniture detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held, on-site at all times. Details shall include removable bollards at the western end of the 3m wide pedestrian/shared path along the northern boundary. All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining boundaries of Tully Park, Bishops Street, Cherrywood Town Centre and the adjoining Post Primary School plot. REASON: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme including PD 14, and in the interest of proper planning and sustainable development of the area. ### Condition 28 AMENITY OPEN SPACE - CLASS 2 28. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: A completed Site Summary Sheet for Site Code 2.9, in accordance with Section B of the Cherrywood Amenity Space Guidance Document. The design response should address all Sections as appropriate. REASON: To ensure consistency with Section 5.4.4 of the Cherrywood Planning Scheme and the Cherrywood Amenity space Guidance Document. ### Condition 29 TREES AND HEDGEROWS 29. a) Prior to the commencement of the development, the Applicant/Developer shall engage the services of a qualified Arborist as an Arboricultural Consultant, prior to and for the entire period of construction activity. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. b) The applicant shall implement all the recommendations pertaining to tree and hedgerow retention, tree and hedgerow protection and tree and hedgerow works, as detailed in the Tree Removal & Protection Plan as per drawing no. (TC6-002) as submitted on 27/02/2026 and Arboricultural Report (dated December 2025) submitted on 27/02/2026. c) All works on retained trees shall comply with proper arboricultural techniques conforming to BS 3998:2010 Tree Work - Recommendations. The clearance of any vegetation including trees and scrub shall be carried out outside the bird-breeding season (1st day of March to the 31st day of August inclusive) or as stipulated under the Wildlife Acts 1976 and 2000. d) At Practical Completion of the development, the Consultant shall carry out a Post- Construction Arboricultural Assessment of all retained trees and submit a signed Arboricultural Completion Certificate to the Planning Authority stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. REASON: To ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. ### Condition 30 30. The Applicant is requested to undertake the following: Prior to the laying of utilities, the applicant shall prepare a combined tree location, infrastructure and utilities plan which accurately locates and identifies all proposed and existing trees in the context of the proposed infrastructure and services (surface water / SuDs and drainage / foul infrastructure / lighting / underground cables etc). Tree root protection for services, in accordance with relevant guidelines, should also be located and specified. REASON: To ensure and appropriate level of tree planting along roads and consistency with GI 44. ### Condition 31 BIODIVERSITY 31. The Applicant is requested to undertake the following: a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Ecologist as an Ecological Consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. b) The Consultant shall ensure the implementation of Section 5.3 Mitigation Measures) and Section 5.4 (Evaluation of Mitigation Measures) of the submitted Ecological Impact Assessment, as well as all recommendations within Habitat Management Plan (prepared by Minogue & Associates, Consulting Ecologists, dated January 2026). REASON: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme and the CPS Biodiversity Plan. ### Condition 32 32. The applicant shall carry out a badger survey of the site including, the area extending for 150m around it, and submit the findings to the Council prior to commencement. In event that a sett is identified, the NPWS shall be consulted to advise on the next steps in accordance with The Wildlife Act 1976 (as amended). REASON: To ensure consistency with the Cherrywood Planning Scheme Biodiversity Plan. ### Condition 33 33. The Applicant/Developer shall consult with Inland Fisheries Ireland with respect to SuDS features within the development, all of which ultimately connect to open water courses. REASON: To minimise impacts on watercourses and their ecology. ### Condition 34 34. Prior to the commencement of landscape development, the Applicant/Developer shall submit for the written agreement of the Planning Authority: Details of Soft Landscape Design to include detailed Planting Plan(s) and Planting Schedule, as appropriate, stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or as otherwise agreed. This shall include sustainable management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency that omit the use of herbicides, pesticides and inorganic fertiliser. Soft landscape proposals shall: i) Accurately plot existing trees to be retained within Tully Park along the north and eastern boundaries as identified in the Tree Survey and show tree protection fencing noting no changes to ground levels are permitted to protect existing willow trees along northern boundary; revise proposed tree planting as appropriate; include detailed planting proposals for the interface with the Park noting this area is to be taken in charge by Parks and should be easily maintained. Parks will take in charge trees, hedgerow, bulbs and naturalised meadow grasses using local soil and seed from local harvesting. Existing soils to be retained and reused to retain existing seedbank and naturally regenerate meadow grass. iii) Show location and provide details of bioretention street trees along the proposed internal roads in accordance with the requirements of the Planning Scheme. Refer to Section 4.2.7 (Internal Roads) in this regard. Trees shall bookend car parking and be spaced at intervals of not more than five perpendicular or two parallel car parking spaces. Proposals shall align with engineering details ensuring root protection from structural loads. iv) Incorporate planting to mitigate for wind as appropriate to ensure seating areas are comfortable to use. REASON: To ensure consistency with the Green Infrastructure Objectives of the Cherrywood Planning Scheme. ### Condition 35 35. The applicant shall ensure that: i) Public lighting is shown on Landscape plans to demonstrate no conflicts with Street Trees. ii) Compensation planting is provided for the removal of hedgerow designated for retention along the western site boundary. iii) Local soil and seed from local seed harvesting is used in the development of new grassland/ wildflower meadows. REASON: To ensure consistency with the Green Infrastructure Objectives of the Cherrywood Planning Scheme. ### Condition 36 PLAY 36. a) Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: Final design details of all play opportunities and facilities (formal and/or informal as appropriate, ensuring high play value), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1 (Playful Space and Natural Play), 4.7.2 (Play Map), and 4.7.3 (Play Matrices) of the Amenity Space Guidance Document and Section 5.6 objectives GI 71 to GI 73 of the Planning Scheme. b) Upon completion of all proposed play spaces and prior to the occupation of residential units, the following shall be submitted for the written agreement of the Planning Authority: A play map in CAD or GIS format, to the Irish Transverse Mercator projection in metres, which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. REASON: To ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; and Specific Objectives GI 71, GI 72 and GI 73 of the Cherrywood Planning Scheme (as amended) and Sections 4.6.3, 4.7.1 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. ### Condition 37 37. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: A 'Boundary Types' strategy providing details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with Tully Park, as permitted under Planning Reg. Ref. DZ15A/0813 (and DZ20A/0946). Specification and details shall ensure a cohesive and harmonious streetscape design and public realm interfaces and shall demonstrate appropriate integration of adjoining developments. The strategy shall include: a. Plans, details and sections of the boundary treatment being proposed along the interface with Tully Park. The Applicant should clearly indicate existing and proposed levels and max and min slopes. The boundary between the Public Realm and the residential plot shall be clearly defined to afford a level of residential privacy while offering natural surveillance of the Public Realm, noting a low railing/low wall with railing with hedgerow on development side is appropriate. High quality finish is required for boundaries facing public realm. The following principles apply to the design of the interface with Public Realm/Tully Park and the Greenway: i. Regrading of Bank. Tie in with existing park levels, forming embankments of 1:4 maximum gradient except where noted in ii below. ii. Tree Protection. Steeper slope required to protect levels around existing willow trees. iii. Construct Entrance Areas. 2 no. plaza's east & west and proposed drainage in accordance with all drainage and SuDS requirements. Tie into existing steps and paths. iv. Install boundary wall or estate railing as appropriate. v. Form Swale. Seeded appropriately, approved by ecologist and clarify the catchment it is draining. vi. Paths as necessary. vii. Tree planting. b. Bollards at the western end of the proposed 3m pedestrian path along the northern boundary interface with Tully Park; c. An Open Space Plan that clearly defines communal, public and private open space including public open space to be amended by the proposed development. d. Boundary details for the western boundary that co-ordinate with those of the school site (DZ21A/10238). e. The Communal open space should not be accessible to the public. Therefore a gated boundary shall be provided, noting public access from Bishop Street Square to Tully Park is required via the stepped access proposed. f. Removal and disposal of post and rail fence (Tully Park/Greenway/Bishop Street) REASON: To ensure consistency with Specific Objectives GI 8, GI 77 and PD 14 of the Cherrywood Planning Scheme. ### Condition 38 38. (i). Prior to the commencement of any house or duplex unit in the development as permitted, the applicant or any person with an interest in the land shall enter into an agreement with the Planning Authority (such agreement must specify the number and location of each house or duplex unit), pursuant to Section 47 of the Planning and Development Act 2000, that restricts all houses and duplex units permitted, to first occupation by individual purchasers i.e. those not being a corporate entity, and/or by those eligible for the occupation of social and/or affordable housing, including cost rental housing. (ii). An agreement pursuant to Section 47 shall be applicable for the period of duration of the planning permission, except where after not less than two years from the date of completion of each specified housing unit, it is demonstrated to the satisfaction of the Planning Authority that it has not been possible to transact each specified house or duplex unit for use by individual purchasers and/or to those eligible for the occupation of social and/or affordable housing, including cost rental housing. (iii). The determination of the Planning Authority, as required in (b), shall be subject to receipt by the planning and housing authority of satisfactory documentary evidence from the applicant or any person with an interest in the land regarding the sales and marketing of the specified housing units, in which case the Planning Authority shall confirm in writing to the applicant or any person with an interest in the land that the Section 47 agreement has been terminated and that the requirement of this planning condition has been discharged in respect of each specified housing unit. REASON: To restrict new housing development to use by persons of a particular class or description in order to ensure an adequate choice and supply of housing, including affordable housing, in the common good. ### Condition 39 DEVELOPMENT CONTRIBUTIONS 39. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €26,542.88 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. ### Condition 40 40. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €398,143.12 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 41 41. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €2,229,586.32 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 42 42. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €665,600.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €412,400.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. ### Condition 43 Section 49 Luas 43. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €879,435.00 and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún laoghaire-Rathdown on the 13th of January, 2003. ### Condition 44 44. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €3,433,312.40 to the Planning Authority a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 45 45. This development shall not be carried out without prior agreement, in writing, between the applicant and the Planning Authority, relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. ## Nearby applications - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. - [DZ21A/1085](https://cherrywoodplans.com/application/DZ21A-1085.md): Lands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (2 Dec 2022). Builds 65 three-bed homes in five three-storey blocks in Macnebury, west of Castle Street. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ26A/0148/WEB](https://cherrywoodplans.com/application/DZ26A-0148-WEB.md): Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads. Granted (20 Jul 2026). 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ26A/0579/WEB](https://cherrywoodplans.com/application/DZ26A-0579-WEB.md): Castle Street (M5), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res2 Plot). More information requested (22 Sep 2026). 40 new homes, mostly 3-bed two-level apartments, off Castle Street in Macnebury. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ26A-0151-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/105043) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._