# Planning application DZ26A/0245/WEB > Lands within the Townland of, Brennanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (30 Jul 2026). - **Reference:** DZ26A/0245/WEB - **Address:** Lands within the Townland of, Brennanstown, Dublin 18 - **Status:** Granted (30 Jul 2026) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Manciano Limited - **Lodged:** 7 Jul 2026 - **Decided:** 30 Jul 2026 - **Location (lat, lng):** 53.254298, -6.148742 ## Proposal Ing of amendments to the development permitted under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E and as amended under Reg. Refs.: DZ24A/0621/WEB and DZ25A/0515/WEB, on lands within the townland of Brennanstown, Dublin 18. The application site is bound by Brennanstown Square to the north, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, Cabinteely Stream (partly) and Beech Park to the east. This amendment application relates to Phase 02 and 03 of the permitted development, which is located to the south of the Cherrywood SDZ Planning Scheme’s Druid’s Glen Distributor Road (also known as P* to P3), which is opened as a public road. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Strategic Development Zone Planning Scheme 2014 (as amended) and forms part of Development Area 5 (known as Druid’s Glen). The proposed amendments, which relate to the Phases 02 and 03 area of the permitted development, can be described as follows: - Redesign of Apartment Block C (now referred to as Blocks 4a and 4b) to comprise 73 no. apartments, including 16 no. 1 beds, 50 no. 2 beds, and 7 no. 3 beds, arranged across 2 no. part 3, part 4 storey buildings, over a lower ground / undercroft level, with associated terraces / balconies on the north-west, eastern, and southern elevations. This results in an increase of 18 no. apartments (from 55 no. to 73 no.); - The proposals include the relocation and increase in the gross floor area of the permitted childcare facility (from 249 sq.m to 307 sq.m) to the lower ground level within Block 4b, with associated play area; and, - All associated development, including provision of 57 no. car parking spaces (comprising 34 no. at undercroft level and 23 no. at surface level), cycle and bin storage, ESB substation, plant and PV panels at roof level, landscaping, open space including play provision, lighting, drainage and all associated infrastructural and site development works. The permitted development (under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E and as amended under Reg. Ref.: DZ24A/0621/WEB and DZ25A/0515/WEB), provides for 347 no. residential units and the proposed amendments would result in an increase to 365 no. residential units (i.e. 18 no. additional units in Phase 02 and 03). ## In plain English Amends a permitted Druid's Glen scheme, adding 18 apartments and enlarging the childcare facility. - **365** homes total - **73** apartments - **57** car spaces - **307** sq.m childcare ### What's planned An amendment to an earlier permission (DZ19A/0863) for Phases 2 and 3 in Brennanstown, raising the overall scheme from **347** to **365** homes. ### Residential Block C is redesigned as Blocks 4a and 4b, **3**–**4** storeys, with **73** apartments instead of **55**: **16** one-beds, **50** two-beds and **7** three-beds. ### Commercial The childcare facility moves to Block 4b and grows from **249** to **307** sq.m, with a play area. ### Transport **57** car spaces (**34** undercroft, **23** surface) plus cycle storage. ### Environment Rooftop solar panels, landscaping and play space. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the 'Residential' (Res 2) zoning of the site, as set out in the Cherrywood SDZ Planning Scheme 2014, as amended, and to the provisions of the Dún Laoghaire-Rathdown County Development Plan 2022-2028, it is considered that, subject to compliance with the conditions set out below, the proposed development would not seriously injure the amenities of the area, would not materially contravene the zoning objective for the application site or adjoining lands, and would be consistent with the Cherrywood SDZ Planning Scheme and the proper planning and sustainable development of the area. Appropriate Assessment (AA) Screening Dún Laoghaire-Rathdown County Council, as the competent authority, is required to undertake screening for Appropriate Assessment (AA). The proposed development, as clarified by way of Further Information received on 07/07/2026, has been screened for AA (report on file) and it has been determined that the proposed development would not have a significant impact on a Natura 2000 site. Environmental Impact Assessment (EIA) Screening It is the responsibility of the competent authority, Dún Laoghaire-Rathdown County Council, to undertake screening for Environmental Impact Assessment (EIA). Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 07/07/2026, comprising the redesign of Block C, now Blocks 4A and 4B, to provide 73 apartments, representing an increase of 18 units from 55, the relocation and increase of the permitted childcare facility from 249 sq.m to 307 sq.m, together with associated car parking, cycle parking, landscaping, drainage and ancillary site works, within an established SDZ planning framework and urban setting, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The DAPT FI Report notes that the environmental consultant's assessment concludes that the proposal is within the environmental parameters of the Cherrywood Planning Scheme, subject to conditions. The need for Environmental Impact Assessment can therefore be excluded and an Environmental Impact Assessment Report (EIAR) is not required. Second Schedule Conditions 1. (a)The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 07/07/2026. (b)Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref. DZ19A/0863, and as extended under DZ19A/0863/E and as amended under Reg. Refs. DZ24A/0621/WEB and DZ25A/0515/WEB, save as may be required by the other conditions attached hereto. For avoidance of doubt, the duration of permission is until the 24th of April 2030. REASON: In the interest of clarity, the proper planning and sustainable development of the area, to ensure that the proposed development is consistent with the Cherrywood Planning Scheme (2014, as amended) and to ensure that effective control can be maintained. PART V 2. The applicant/developer shall enter into an agreement in accordance with Part V of the Planning and Development Act 2000, as amended, prior to commencement of development, unless the applicant/developer has applied for and been granted an exemption certificate under Section 97 of the Act. No demolition should take place before the City Valuer has an opportunity to inspect the buildings and development site in its current state. REASON: In the interest of proper planning and sustainable development. 3. Prior to the completion of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 4. Prior to the commencement of development, the Applicant/Developer shall provide, for the written agreement of the Planning Authority: a. Details of external design/finishes including: windows and doors, balconies, under croft screening, car park/basement entrance detail, roof services/plant and associated screening, ESB substations/ switch rooms, ancillary structures, all in the form of drawings, plans, elevations, sample photos and on-site mock-ups. The Planning Authority shall be notified when the on-site mocks-ups are available for inspection. b. The external finishes shall include materials that are: • of a high quality, durable, sustainable and attractive, • at ground floor and facing the public realm, comprise of durable and high-quality materials including natural stone or brick, • at rooftop, materials and treatments, including screening, shall be light in colour. • ensure harmony and visual coherence in the built environment. c. The location and details, including materials, of bike stores, bin stores and staging areas, service and meter boxes and other similar ancillary provisions located within the curtilage of development, and to ensure that they do not register as visual clutter. REASON: To ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning Scheme 5. Prior to commencement of development, the Applicant/Developer shall submit, for the written agreement of the Planning Authority, a revised landscaping masterplan and associated drawings, in keeping with the changes set out under the cover letter and Landscape, Biodiversity and Visual Statement submitted under further information response stage on the 7th of July 2026, which include a 1,000mm wide, landscaped, privacy strip. REASON: To ensure consistency with Objectives PD 16 and PD 17 of the Cherrywood Planning Scheme. 6. Prior to the installation of any signage associated with the proposed development, the Applicant/Developer shall submit for the written agreement of the Planning Authority a Signage and Wayfinding Strategy including: a. Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. b. Street name and numbering in accordance with Objectives H6 and GI 10 and with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. c. Full details of the location and content including background colour, lettering typeface, logos and colour. d. Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. 7. A construction noise and vibration monitoring programme shall be submitted by the Applicant/Developer to, and agreed in writing with, the Planning Authority prior to commencement of development. The programme shall include specified noise and vibration monitoring locations, project construction noise and vibration limits, and reporting procedures, for the duration of construction works. REASON: In order to protect the amenities of noise and vibration sensitive properties in the vicinity of the development. PHYSICAL INFRASTRUTURE CONSTRUCTION MANAGEMENT 8. Prior to the commencement of development, the Developer shall comply with the following: a. Prior to commencement of development, the Applicant/Developer shall submit a final detailed Construction Management Plan (CMP) for the written agreement of the Planning Authority that shall include full details, including engineering layouts as appropriate for the site compound, details of the proposed programme and methodology, working hours, and any proposals for construction phasing. The CMP shall also include full details of the following: i. A CEMP (Construction Environmental Management Plan), that fully outlines environmental management measures to be implemented during the construction stage. The CEMP shall align with, but not be limited to, measures included in the various documents provided by the applicant including the PCEMP and EcIA. It shall contain but not be limited to: clear trigger levels and remedial actions to ensure avoidance of any exceedances of applicable environmental effect thresholds; protocols for independent environmental compliance auditing; protocols to ensure timely reporting and accessibility of audit findings; including an updated system for monitoring activity at the nearby main badger sett. ii. A RWMP (Construction & Demolition Resource Waste Management Plan), that details how the RWMP will be measured and monitored throughout the construction stage, as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021). iii. A SWMP (Surface Water Management Plan), that details appropriate surface water management procedures/measures for the construction stage of the development, in accordance with the requirements of the Planning Authority. iv. A CTMP (Construction Traffic Management Plan), that details all traffic management measures and signage for the proposed construction access routes. This shall include all the safety implications arising from the Beckett road construction, as necessary, and details of construction vehicle parking and queueing proposals, noting parking for construction vehicles shall be provided within the site boundary. v. A CLP (Community Liaison Plan), including a nominated Project Liaison Officer (PLO) to manage all public relations issues relating to the construction works. vi. Vibration, Dust & Noise Management Proposals, that demonstrate compliance with industry standards. b. For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Applicant/Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development, to demonstrate how the existing road network is to be maintained to an acceptable standard throughout the construction phase. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 & DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both i. prior to commencement of development and ii. post completion of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard which is to the satisfaction of the Planning Authority. c. Prior to the commencement of development, the Applicant/Developer shall nominate an individual as Designated Community Liaison Officer (DCLO) for the subject development and shall advise the Planning Authority of this nomination in writing. d. Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This should be addressed in the Community Liaison Plan. e. Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. f. Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. g. Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. h. Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. i. A Noise Management Plan shall be developed and implemented demonstrating selection of construction methodology and implementation of mitigation measures to minimise nuisance affecting adjoining properties and design of building services, such as ventilation equipment and ducting, to avoid creation of nuisance affecting adjoining residential areas. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, and in the interests of orderly development, proper planning and sustainable development and environmental protection, compliance with the Cherrywood Planning Scheme (as amended) and DLR County Biodiversity Action Plan 2021-2025, and to mitigate against any adverse impacts on nearby residents and ecological receptors. WATER SUPPLY 9. Prior to the commencement of development, the Developer shall comply with the following: a. The detailed design of the water supply and wastewater infrastructure including details of all connections shall be in accordance with Uisce Éireann specification and requirements. The water supply and wastewater infrastructure for the development shall be designed and installed in accordance with Uisce Éireann's overall water supply masterplan for Cherrywood SDZ and Uisce Éireann's standards and codes of practice. The Applicant/Developer's designs shall be consistent with designs permitted under planning reference DZ15A/0758 and the Planning Scheme, or as otherwise agreed with Uisce Éireann. All works to facilitate new water mains and drainage connections to Uisce Éireann infrastructure shall be undertaken at the Applicant/Developer's sole expense. b. Should the Applicant/Developer wish to provide temporary connections for the subject development to existing Uisce Éireann infrastructure, either directly or indirectly, they are required to enter into a separate pre-connection agreement with Uisce Éireann, prior to the commencement of any works on site. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. To ensure agreement with Uisce Éireann for the applicant's design proposals and to ensure the adequate provision of water and wastewater. SURFACE WATER DRAINAGE 10. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority the following: a. Details of the proposed Tree Root Structural Cell Systems for all proposed trees within the development. b. Drawing demonstrating the connection of the 2 no. trees which are currently not connected to the surface water network. c. Updated drawings of the proposed surface water drainage arrangements for the southern landscaped area and any associated Sustainable Drainage Systems measures. All SuDS shall be connected to the proposed surface water network. d. Drawing and supporting information for the section within undercroft of the slung drainage pipe connecting podium to the attenuation tank. e. Resubmission of calculations of the surface water network model, demonstrating that the subject development is not under risk of flooding, allowing for at least 500mm freeboard. The Applicant/Developer shall: f. Proposed an attenuation tank location that remains outside the ecological buffer zone. REASON: In the interests of proper planning, sustainable development and to ensure consistency with PI 6, PI 10 Section 4.2.7, GI 43 and GI 65 of the Planning Scheme. 11. Prior to the commencement of development, the Developer shall comply with the following: a. A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development and shall outline how the applicant/developer will maintain the runoff rate to 1 l/s/ha for each phase of construction and commissioning of the surface water network. b. For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. c. A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. 12. Prior to the commencement of development, the Developer shall comply with the following: Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority a revised exceedance flow route drawing for the development. The drawing shall clearly identify the proposed exceedance flow paths, demonstrate routing away from buildings and critical infrastructure and confirm the safe conveyance of exceedance flows to an appropriate discharge location. REASON: In the interest of proper planning and sustainable drainage and to ensure compliance with PI 6 and PI 9 of the Cherrywood Planning Scheme. PEDESTRIAN PERMEABILITY 13. Prior to the commencement of development, the Developer shall comply with the following: Prior to the commencement of development, the Applicant/ Developer shall submit for the written agreement of the Planning Authority detailed drawings including dimensions of the following: a. Access to Block 4A from ground podium level, ensuring an unobstructed footpath width of 2.0m or as otherwise agreed with the Planning Authority. Additionally, the Applicant/Developer shall provide: b. Universal access to allow for mobility impaired users to access Block 4A from Druids Glen Road. REASON: To allow for pedestrian and cycle permeability and in the interests of consistency with PI 20 and PI 22of the Cherrywood Planning Scheme. CAR PARKING 14. Prior to the commencement of development, the Developer shall comply with the following: a. The Applicant/Developer shall provide ducting to all remaining car parking spaces to facilitate the future installation of EV charging points and ensure that all parking spaces are future-proofed for electric vehicles. REASON: In the interests of sustainable development and to comply with the requirements of PI 21ofthe Cherrywood Planning Scheme. BICYCLE PARKING 15. Prior to the commencement of development, the Developer shall comply with the following: Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority updated drawings setting out the following: a. Location of the proposed 2no. long-stay spaces for the creche which shall be lockable and covered. b. Location of the proposed visitor spaces for the creche, which shall include at least 2no. regular spaces and 2no. spaces for cargo bikes. c. Optimised design of Bike Shelter 02, providing 4 no. additional standard cycle parking or as otherwise agreed with the Planning Authority. REASON: In the interest of proper planning and cyclists' safety and for consistency with PI22of the Planning Scheme and the current DLR County Development Plan. UTILITIES AND TELECOM 16. The provision and location of service ducts, pipes, manholes and service chambers shall be agreed with the relevant service providers. The services to be considered include electricity, water, gas, telecoms, traffic communication and public lighting. REASON: In the interests of orderly development and to ensure the inclusion of infrastructure and connections to avoid subsequent excavation of the newly constructed roadway; to ensure that designs meet with the current and future requirements of the Planning Authority (DLR Traffic and Public Lighting Sections) and the relevant utility and service providers; to avoid conflict with landscaped areas and street trees and to ensure consistency withPI4,PI6,PI12,PI14,PI26 of the Cherrywood Planning Scheme. GREEN INFRASTRUCTURE 17. Prior to the commencement of development, the Developer shall comply with the following: a. The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. b. The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. REASON: To ensure ahigh-quality Public Realm, to ensure consistency with the Cherrywood Planning Scheme (as amended) and in the interest of proper planning and sustainable development of the area. 18. Prior to commencement of development of the residential or landscape/public realm development, whichever comes sooner, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: a. Landscape Masterplan and other relevant drawings all at an appropriate scale including cross-sections and appropriate elevations. The landscape proposals shall provide a bench within the communal space/play area to the north of Block 4B. b. Hard landscape plans, construction details and maintenance plans for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), and proposed street furniture, detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held, on-site at all times. c. All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining developments. REASON: To ensure consistency with the Cherrywood Planning Scheme (as amended) and Specific Objectives PD 14 and GI 7. 19. Prior to the laying of utilities, the Applicant/Developer shall prepare a combined tree location, infrastructure and utilities plan which accurately locates and identifies all proposed and existing trees in the context of the proposed infrastructure and services (surface water / SuDs and drainage / foul infrastructure / lighting / underground cables etc). Tree root protection for services, in accordance with relevant guidelines, should also be located and specified. REASON: To ensure an appropriate level of tree planting along roads and to ensure consistency with Specific Objective GI 44 of the Cherrywood Planning Scheme (as amended). 20. The development proposals shall exclude all cycle parking, structures, edge restraints, and hardstanding surfacing from within the 2m ecological buffer zone associated with the proposed hedgerow along the southern site boundary. REASON: To ensure consistency with the Cherrywood Biodiversity Plan. 21. a. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, the final lighting design, approved by a suitably qualified specialist bat ecologist that has regard to best practice guidance in relation to minimising light pollution and impacts on bats. This is to ensure the native hedgerow and ecological buffer can support future bat populations. The submitted details shall include an updated assessment of potential impacts on bats from light spill, prepared by the specialist bat ecologist. b. All trees to be felled as part of the development shall be visually re-examined for the presence of bats by a suitably qualified bat specialist prior to felling. The survey results shall be submitted to the Planning Authority. In the event bats are identified, appropriate avoidance/mitigation/compensation measures shall be defined and agreed in writing with the Planning Authority prior to felling. It is noted that, in the event protected bat species are identified, a Derogation Licence from the NPWS may be required. REASON: In the interest of biodiversity, bat protection and compliance with Specific Objectives GI 46, GI 50 and GI 52 of the Cherrywood Planning Scheme (as amended). 22. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority: An addendum to the Habitat Management Plan (HMP) that omits a mown strip within the ecological buffer associated with the proposed double staggered native hedgerow along the southern site boundary and clearly demonstrates that the buffer zone will be managed in a manner consistent with its intended ecological function. REASON: To ensure that the proposed hedgerow and associated ecological buffer zone are protected and managed appropriately and to ensure consistency with Specific Objective GI 59 of the Cherrywood Planning Scheme (as amended). 23. Prior to the commencement of development, the Applicant/Developer shall provide, for the written agreement of the Planning Authority: a. Details of Soft Landscape Design to include detailed Planting Plan(s) and Planting Schedule as appropriate, (including the replacement of Tree line 1 within Hedge 3), stating species/varieties, approximate quantities, sizes, age, rootball presentation and spacings/planting density. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or as otherwise agreed. This shall include long-term sustainable management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency that omit the use of herbicides, pesticides and inorganic fertiliser. The submitted scheme must demonstrate that the planting will provide adequate biodiversity value. b. The planting shall be carried out in accordance with the said details within the first planting season following commencement of development. c. Any plants which die, are removed or become seriously damaged or diseased, shall be replaced within the next planting season with others of similar size and species, unless otherwise agreed in writing with the planning authority. d. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC), as verification that approved landscape plans and specification have been fully implemented. e. Landscape proposals (including sections and details as appropriate) shall show all bioretention SuDS tree pits with cellular storage consistent with engineering proposals. REASON: In the interest of visual/residential amenity and biodiversity, to ensure long-term continuity and consistency in management of newly planted trees, shrubs and other vegetation, and compliance with Specific Objectives GI 42, GI 43, GI 45, GI 59 and GI 65 of the Cherrywood Planning Scheme (as amended). 24. The Applicant/Developer shall ensure that: i. Public lighting is shown on Landscape plans to demonstrate no conflicts with Street Trees. ii. New hedgerow planting shall take the form of a double line of mixed native tree and shrub species in accordance with BP12 of the Cherrywood Biodiversity Plan. The new hedgerow shall be 2m wide, double staggered, mixed native species with a 2m ecological buffer along the development side as required by Map 5.2 and the Cherrywood Biodiversity Plan. No hardstanding surfacing or structures shall be located within the ecological buffer. iii. The landscape management programme shall ensure climbing plants do not block airflow to the carpark. iv. Local soil and seed from local seed harvesting is used in the development of new grassland/ wildflower strips/areas. v. Street trees are spaced at intervals of not more than five perpendicular or two parallel car parking spaces in accordance with Section 4.2.7 and Figure 4.4 and to comply with DMURS and Specific Objective GI 44. vi. Proposals are consistent across disciplines and reflected in all relevant drawings. REASON: To ensure consistency with the Green Infrastructure Objectives of the Cherrywood Planning Scheme. 25. a. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: i. Final design details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1 (Playful Space and Natural Play), 4.7.2 (Play Map), and 4.7.3 (Play Matrices) of the Amenity Space Guidance Document. ii. The provision of a play item of greater play value such as an accessible swing, embankment slide or forest boat to replace the proposed balance beam and poles in the communal amenity space at podium level to the north of block b. b. Upon completion of all proposed play spaces and prior to the occupation of residential units, the following shall be submitted for the written agreement of the Planning Authority: A play map in CAD or GIS format, to the Irish Transverse Mercator projection in metres, which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. REASON: To ensure the provision and construction of safe, quality play amenities provision in compliance with Section 5.6 (Play), Section 5.4.4 (Communal Open Space), 5.4.7 (Trees & Hedgerows), 5.5.3 (Maintenance of physical ecological connectivity with Green Infrastructure) and Specific Objectives GI 71 to GI 73 of the Cherrywood Planning Scheme (as amended) and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. 26. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority: Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space, having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site and harmonise with and complement adjoining development. Include where relevant sections & elevations clearly indicating the location, specification, type & height of all proposed edge restraints, structures, boundary treatments and gates in accordance with GI 76 of the Cherrywood Planning Scheme. REASON: To ensure consistency with Specific Objectives GI 8, GI 76 and PD 14 of the Cherrywood Planning Scheme (as amended). CONTRIBUTIONS Countywide Surface Water 27. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €2,766.08 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. Countywide Transport Infrastructure 28. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €42,985.78 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Countywide Community & Parks Facilities & Recreational Amenities 29. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €240,711.34 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Public Infrastructure and Facilities 30. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €358,571.01 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. BONDS 31. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a. Lodgement with the Council of an approved Insurance Company Bond in the sum of €52,200.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b. Lodgement with the Council of a Cash Sum of €32,400.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 32. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTE: To ensure no adverse impact on Luas operation and safety, the applicant, developer or contractor shall be required to apply for a works permit from the Luas Operator by virtue of the Light Railway (Regulation of Works) Bye-laws 2004 (S.I. number 101 of 2004) which regulates works occurring close to the Luas infrastructure in accordance with TII's 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. The developer shall be liable for all of TII's costs associated with the removal and reinstatement of Luas related building fixings and infrastructure. The permit application will require prior consultation, facilitated by the Luas Operator, Transdev. NOTE: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. NOTE: This permission does not imply any consent or approval for the structural stability and / or habitability of the works carried NOTE: Any alterations to the drainage systems within the site are a matter for compliance with the Building Regulation. NOTE: The proposed development shall accord with the requirements of Uisce Éireann. ## Nearby applications - [DZ25A/0515/WEB](https://cherrywoodplans.com/application/DZ25A-0515-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (4 Dec 2025). Amends Phases 2 and 3 of a permitted Druid's Glen scheme, swapping unit types and adding 7 homes (346 to 353). - [DZ24A/0621/WEB](https://cherrywoodplans.com/application/DZ24A-0621-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Granted (21 Jan 2025). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ24A/0585/WEB](https://cherrywoodplans.com/application/DZ24A-0585-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Refused or withdrawn (8 Aug 2024). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ19A/0863](https://cherrywoodplans.com/application/DZ19A-0863.md): Site is generally bounded by Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south and, Cabinteely Stream (partly) to the east and is located within the townland of, Brennanstown, Dublin 18. Granted (14 Jan 2020). 342 new homes in Druid's Glen, Brennanstown, with a crèche and part of the Druid's Glen road and bridge. - [D04A/0988](https://cherrywoodplans.com/application/D04A-0988.md): BRENNANSTOWN, CABINTEELY, DUBLIN 18.. Refused or withdrawn (22 Oct 2004). A large Brennanstown development of 702 homes in 26 buildings of 3 to 8 storeys, with a school building, shop and community hall. - [DZ18A/0208](https://cherrywoodplans.com/application/DZ18A-0208.md): Site approx. 6.57ha in area and generally bounded by, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, and Cabinteely Stream, (partly) to the east that is, located within the townland of, Brennanstown, Dublin 18. Granted (4 Feb 2020). Builds 367 homes, a mix of apartments, two-level units and houses, plus a childcare facility in Brennanstown. - [D08A/1293](https://cherrywoodplans.com/application/D08A-1293.md): Lehaunstown House, Lehaunstown, Cabinteely, Dublin 18. Refused or withdrawn (30 Jan 2009). Extensions to Lehaunstown House, Cabinteely, making it a 5-bedroom home with a sunroom and pool. - [D08A/0728](https://cherrywoodplans.com/application/D08A-0728.md): Lahaunstown House, Lahaunstown, Cabinteely, Dublin 18.. Refused or withdrawn (31 Jul 2008). A new 4-bedroom, two-storey house beside Lahaunstown House, Cabinteely. - [DZ16A/0587](https://cherrywoodplans.com/application/DZ16A-0587.md): Site of 2.79 ha approx. at Beech Park, Bray Road, Cabinteely, Dublin 18/Loughlinstown, Co Dublin. Granted (21 Dec 2016). 34 houses at Beech Park, Bray Road, replacing six homes, plus part of the Druid's Glen Road and bridge. - [DZ25A/0318/WEB](https://cherrywoodplans.com/application/DZ25A-0318-WEB.md): Lands within the townland of Brennanstown, Dublin 18. Granted (20 Aug 2025). 24 new two-storey houses off the Druid's Glen road in Brennanstown. - [DZ23A/0083](https://cherrywoodplans.com/application/DZ23A-0083.md): Druid House & Glendruid House (protected structure), Lehaunestown Lane, Brennanstown Road, Brennanstown, Dublin 18. Granted (20 Oct 2023). Rebuilding a boundary wall on Lehaunstown Lane and a new access road to prepare for the permitted Druid's Glen Road. - [D18A/0590](https://cherrywoodplans.com/application/D18A-0590.md): The Pines, Lehaunstown Lane, Cabinteely, Dublin 18, D18 E3X7. Granted (11 Sep 2018). Replaces a septic tank with a modern wastewater treatment system at The Pines, Lehaunstown Lane. - [DZ20A/0491](https://cherrywoodplans.com/application/DZ20A-0491.md): Site of c. 5.295 hectares, located at Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (19 Oct 2020). Amends a permitted Beech Park apartment block, raising it from 65 to 70 homes with no change in parking. - [DZ20A/0362](https://cherrywoodplans.com/application/DZ20A-0362.md): On a site of c. 5.295 hectares, Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18, Loughlinstown, County Dublin. Granted (31 Aug 2020). Amends the Beech Park scheme on Bray Road to add 3 apartments to Block F, a gym and a pet room, and more bike parking. - [DZ20A/0056](https://cherrywoodplans.com/application/DZ20A-0056.md): Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (18 Mar 2020). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F. - [DZ19A/0768](https://cherrywoodplans.com/application/DZ19A-0768.md): Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (29 Nov 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F and add a residents' gym. - [DZ19A/0622](https://cherrywoodplans.com/application/DZ19A-0622.md): Beech Park, Bray Road, Cabinteely, Dublin 18 / Loughlinstown, County Dublin. Granted (17 Oct 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments and split off land taken by the Council for a new road. - [D15A/0385](https://cherrywoodplans.com/application/D15A-0385.md): Site of 5.295 ha approximately at Beech Park, Cabinteely, Dublin 18 / Loughlinstown, Co Dublin and its connection with the N11.. Granted (18 Oct 2017). 164 homes, mostly houses and two-level apartments, at Beech Park, Cabinteely, plus the first stretch of the Druid's Glen Road. - [DZ20A/0073](https://cherrywoodplans.com/application/DZ20A-0073.md): At a site of c. 5.295 hectares, Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (30 Jun 2020). Redesign of three permitted apartment blocks at Beech Park, Bray Road, changing the unit mix but keeping 65 apartments. - [D02A/0317](https://cherrywoodplans.com/application/D02A-0317.md): Site (walled garden) Glendruid, Brennanstown Road,, Cabinteely, Dublin 18.. Granted (10 Jun 2002). Builds a two-storey, four-bedroom house with a garage and stables in the walled garden at Glendruid, a protected structure. - [D13A/0545](https://cherrywoodplans.com/application/D13A-0545.md): Tablick, Lehaunstown, Cabinteely, Co Dublin. Granted (24 Jan 2014). Extends and alters a dormer bungalow at Tablick, Lehaunstown, adding a larger kitchen and an ensuite. - [D10A/0262](https://cherrywoodplans.com/application/D10A-0262.md): Talblich, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (8 Jul 2010). 13 new houses replacing a house at Talblich, Lehaunstown Lane. - [D15A/0716](https://cherrywoodplans.com/application/D15A-0716.md): Cartref and Ards, Old Bray Road, Cabinteely, Dublin 18. Refused or withdrawn (19 Jan 2016). 51 homes, apartments and houses, at Cartref and Ards on the Old Bray Road. - [D06A/0557](https://cherrywoodplans.com/application/D06A-0557.md): Grounds and Dwellings Ards & Cartref, Old Bray Road, Cabinteely, Dublin 18. Granted (9 Nov 2006). 77 apartments and two-level homes in 3 blocks of 2 to 5 storeys at Ards and Cartref, Old Bray Road. - [D18A/0551](https://cherrywoodplans.com/application/D18A-0551.md): Site (c.1.46ha) at Ards, Cartref and lands to the rear of Foxley, Old Bray Road, Cabinteely, Dublin 18. Granted (23 Jan 2019). 72 homes, apartments and houses, at Ards, Cartref and behind Foxley on the Old Bray Road. - [D08A/0717](https://cherrywoodplans.com/application/D08A-0717.md): Ards, Cartref and Foxley, Old Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (14 Aug 2008). 127 apartments, penthouses and two-level homes in 4 buildings at Ards, Cartref and Foxley, Old Bray Road. - [D22A/0350](https://cherrywoodplans.com/application/D22A-0350.md): Circle K Centenary Service Station, Bray Road, Dublin 18, D18AK58. Granted (25 Aug 2022). Shop revamp at the Circle K service station on Bray Road, adding a deli and enlarging the retail area. - [D06A/0452](https://cherrywoodplans.com/application/D06A-0452.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (26 May 2006). Lets part of the approved shop at Centenary Service Station, Cabinteely, operate as an off-licence. - [D05A/0567](https://cherrywoodplans.com/application/D05A-0567.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (20 Jan 2006). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D05A/0322](https://cherrywoodplans.com/application/D05A-0322.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (19 Apr 2005). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [PC/IC/02/16](https://cherrywoodplans.com/application/PC-IC-02-16.md): N11, Cabinteely, Dublin 18. Granted (12 Jun 2017). Builds a new signalised junction on the N11 at Cabinteely with crossings, bus stops and landscaping. - [D06A/1367](https://cherrywoodplans.com/application/D06A-1367.md): Navarone & Tablick, Brennanstown Road / Lehaunstown Lane, Cabinteely, Dublin 18.. Granted (7 Feb 2008). 76 apartments and townhouses in two blocks of up to 5 storeys at Navarone and Tablick, Brennanstown Road. - [D15A/0228](https://cherrywoodplans.com/application/D15A-0228.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Refused or withdrawn (28 May 2015). Either 7 or 9 new large houses in the grounds of Navarone, Brennanstown Road. - [D04A/0926](https://cherrywoodplans.com/application/D04A-0926.md): Brennanstown Avenue, Brennanstown, Cabinteely, Co. Dublin. Granted (11 Oct 2004). Adds a 26 sq.m single-storey rear extension to each of 11 approved houses on Brennanstown Avenue. - [D15A/0667](https://cherrywoodplans.com/application/D15A-0667.md): Glendruid Mews, Brennanstown Road, Cabinteely, Dublin 18 (corner with Lehaunstown Lane). Granted (23 Mar 2016). Refurbishes an outbuilding at Glendruid Mews to add living space to the existing house. - [D15A/0187](https://cherrywoodplans.com/application/D15A-0187.md): Glendruid Mews, Brennanstown Road, Cabinteely, Dublin 18 (corner with Lehaunstown Lane). Refused or withdrawn (13 May 2015). Replaces a storage shed with a two-storey extension to a house at Glendruid Mews. - [D16A/0852](https://cherrywoodplans.com/application/D16A-0852.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Granted (12 Apr 2017). A new 5-bedroom detached house beside Navarone on Brennanstown Road. - [D06A/0330](https://cherrywoodplans.com/application/D06A-0330.md): Glendruid and Knockenree, Brennanstown Road and Druid House, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (7 Apr 2006). Builds 191 homes, a mix of apartments and houses, at Glendruid and Knockenree off Brennanstown Road. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [D06A/0713](https://cherrywoodplans.com/application/D06A-0713.md): Glendruid & Knockenree, Brennanstown Road, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (22 Jun 2006). 173 homes, apartments in blocks of up to 8 storeys plus houses, at Glendruid and Knockenree on Brennanstown Road. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ26A-0245-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/105345) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._