在 Priorsland 建一个新的村镇中心,包括 443 套住宅、一家超市、商店、托儿所,以及公共公园的第一期。
Priorsland, Within the Townsland of Carrickmines Great and Brennanstown, Dublin 18
- 443
- 套住宅
- 1,306
- 平方米超市
- 5
- 层(最高)
Priorsland, Within the Townsland of Carrickmines Great and Brennanstown, Dublin 18
正在从议会网站加载文件…
一个综合用途的村镇中心和住宅项目,紧邻 Carrickmines Stream 和 Carrickmines Luas 停车换乘站。
402 套公寓(146 套一居室、218 套两居室、38 套三居室),分布在 6 栋最高 5 层的楼里;另有 41 栋房屋(19 栋三居室,22 栋四居室)。
一家约 1,306 平方米的超市、7 个商铺单元(715 平方米)、2 个商业单元、一家健身房,以及约 708 平方米的办公室。
一所约 513 平方米的托儿所、约 252 平方米的社区空间,以及沿溪流修建的 Priorsland 公共公园第一期。
Castle Street 将穿过场地修建,并有两座跨溪公路桥:一座服务未来的学校,另一座提供通往 Carrickmines Luas 站的步行和自行车通道。另建一座通往公园的人行桥。
沿场地靠近 M50 的一侧设隔音屏障。
由 AI 根据议会的描述撰写。以文件为准。
Permission for development at this site. The site comprises land adjacent the Carrickmmines Stream and Carrickmines Luas Park & Ride. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). The development will comprise a mixed-use Village Centre and residential development as follows: 402 no. apartments (comprising 146 no. 1-beds; 218 no. 2-beds and 38 no.3-beds) within 6 no. blocks (Bl...
Permission for development at this site. The site comprises land adjacent the Carrickmmines Stream and Carrickmines Luas Park & Ride. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). The development will comprise a mixed-use Village Centre and residential development as follows: 402 no. apartments (comprising 146 no. 1-beds; 218 no. 2-beds and 38 no.3-beds) within 6 no. blocks (Blocks A-F) ranging in height up to 5 storeys with basement/undercroft parking areas. 41 no. terraced/semi-detached/detached houses (comprising 19 no. 3-beds and 22 no. 4-beds). A supermarket (c.1,306 sq.m), 7 no. retail/retail services units (c.715 sq.m total gross floor area); 2 no. non retail/commercial units (c.213 sq.m total gross floor area); creche (c.513 sq.m), gym (c.155 sq.m), community space (c.252 sq.m) residential facilities (c551.8 sq.m total gross floor area), office/high intensity employment use (c.708 sq.m). Provision of car/bicycle/motorcycle parking at basement/undercroft/ground level. ESB sub-stations/switchrooms/kiosks, waste storage areas, plant areas. Provision of the first phase of Priorsland Public Park along the Carrickmines Stream and additional public and communal spaces. Provision of an acoustic barrier along the southern/ south-western edge of the site adjacent to the M50. Construction of Castle Street on the subject lands and two road bridges across the Carrickmines Stream, one to serve a future school site, the second to provide interim pedestrian and cyclist access to the Carrickmines Luas Station and future Transport Interchange. Provision of a pedestrian bridge from the Village Centre to Priorsland Park. The proposed development includes for all associated site development works landscaping, boundary treatments and service provision. The application contains a statement setting out how the proposal will be consistent with the Dun Laoghaire -Rathdown County Development Plan 2016-2022 (currently in force) and the Dun Laoghaire - Rathdown County Development Plan 2022-2028 (adopted, not yet in force), and the Cherrywood SDZ Planning Scheme, 2014 (as amended). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development