Builds an above-ground gas pipeline facility with a new 601-metre access route off Lehaunstown Lane.
Lands (c.1.87 ha) in the townland of Laughanstown, Dublin 18
- 1.87
- hectares
- 601
- metre access route
- 2
- structures
Lands (c.1.87 ha) in the townland of Laughanstown, Dublin 18
Loading documents from the council’s portal…
An above-ground installation for operating and maintaining a gas pipeline, mostly just outside the Cherrywood scheme boundary.
Two small structures: a regulator unit (48.75 sq.m, up to 3.2 m high) and a boiler/instrument kiosk (48.1 sq.m, up to 3.9 m high), with two 9 m floodlights and 2.4 m security fencing.
A new access route about 601 metres long from the Lehaunstown Lane/M50 bridge.
Includes landscaping.
Written by AI from the council’s description. The documents are the official record.
Permission for the construction of gas infrastructure. The proposed development will consist of the construction of an above ground installation (AGI) facility, for the operation and maintenance of gas pipeline. The facility includes 2 no. structures - a regulator skid (48.75 sqm, maximum height of 3.2 metres) and a boiler/instrumentation kiosk (48.1 sqm, maximum height of 3.9 metres); associated underground pipework; 2 no. 9m high floodlights and 2.4 metre high security fencing. Permission i...
Permission for the construction of gas infrastructure. The proposed development will consist of the construction of an above ground installation (AGI) facility, for the operation and maintenance of gas pipeline. The facility includes 2 no. structures - a regulator skid (48.75 sqm, maximum height of 3.2 metres) and a boiler/instrumentation kiosk (48.1 sqm, maximum height of 3.9 metres); associated underground pipework; 2 no. 9m high floodlights and 2.4 metre high security fencing. Permission is also sought for a new access route from the existing Lehaunstown Lane/M50 overbridge (total length c.601 metres), landscaping and all associated site and development works. The elements of the proposed development outside the Cherrywood SDZ Planning Scheme boundary include c. 345 metres of the access route (noted above), the AGI facility, landscaping and associated site and development works. Total site area outside Planning Scheme boundary is c.1.2 ha. This application relates to development partly within the Cherrywood Strategic Development Zone (SDZ and subject to the Cherrywood Planning Scheme, 2014.