Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
土地平整和排水工程,保留已经填放的土方,并设一处表土堆放区。
工程范围约 8.6 公顷,其中包括保留 1.5 公顷上的填土。表土堆放区在 Laughanstown,约 5.1 公顷。
从 Wyattville Road 的 N11 进出;表土场地从 Tully Lane 桥进出。
已提交环境影响说明。
由 AI 根据议会的描述撰写。以文件为准。
Land shaping and drainage works to a site of circa. 8.6 hectares and for retention of earthworks fill on part of the site (area 1.5 hectares) at Cherrywood/Glebe (E.D. Rathmichael) with access from the N11 at Wyattville Road and for permission for the storage of topsoil on a site of circa 5.1 hectares at Laughanstown with access from Tullylane accommodation overbridge. An Environmental Impact Statement will be submitted with this application.
Land shaping and drainage works to a site of circa. 8.6 hectares and for retention of earthworks fill on part of the site (area 1.5 hectares) at Cherrywood/Glebe (E.D. Rathmichael) with access from the N11 at Wyattville Road and for permission for the storage of topsoil on a site of circa 5.1 hectares at Laughanstown with access from Tullylane accommodation overbridge. An Environmental Impact Statement will be submitted with this application.