允许 F1 至 F3 办公楼地下停车场最多 229 个车位用作临时停车,为期 7 年。
Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18)
- 229
- 个车位
- 7
- 年
Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18)
正在从议会网站加载文件…
修改早期许可的条件,让 F1 至 F3 楼下的部分地下停车场可以临时使用。
两层地下室中最多 229 个车位可在 7 年内用于 Cherrywood 的施工相关停车,并取代一个临时地面停车场。
由 AI 根据议会的描述撰写。以文件为准。
The application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as Amended intend to apply for development. The proposed development will consist of: Amendments to Condition 10 of Ref. Ref: DZ17A/0122 and Condition 13 of Reg. Ref. DZ18A/1104 to allow for the use of up to 229 spaces of the permitted basement car park at Levels -1 and -2 for a period of 7 years for temporary parking. This temporary use will, in...
The application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as Amended intend to apply for development. The proposed development will consist of: Amendments to Condition 10 of Ref. Ref: DZ17A/0122 and Condition 13 of Reg. Ref. DZ18A/1104 to allow for the use of up to 229 spaces of the permitted basement car park at Levels -1 and -2 for a period of 7 years for temporary parking. This temporary use will, inter alia, provide temporary parking associated with construction activities in Cherrywood and will also facilitate the relocation of existing temporary surface car parking spaces constructed under Reg. Ref: SD17A/0417.