Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys.
Townlands of Laughanstown, and Brennanstown, Dublin 18
- 4
- extra apartments
- 4
- storeys
- 0.8
- hectare site
Townlands of Laughanstown, and Brennanstown, Dublin 18
Loading documents from the council’s portal…
Changes to the development permitted under DZ23A/0028 on tile T13, beside Beckett Park and Castle Street, on about 0.8 hectares.
4 extra apartments (2 one-bed, 2 two-bed) on a new third-floor level, making Apartment Building 1 4 storeys, with a stepped roofline.
4 more car spaces, 5 more bicycle spaces and 1 more motorcycle space.
Part of the storm water storage area is moved.
Written by AI from the council’s description. The documents are the official record.
LSREF V Eden T13 Limited Intend to Apply for Permission on a site In the Townlands of Laughanstown and Brennanstown, Dublin 18. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The site of the proposed development is located in the Cherrywood Planning Scheme area and forms part of Development Area 8 – Tully. The site of the development proposed is generally bound by other lands wit...
LSREF V Eden T13 Limited Intend to Apply for Permission on a site In the Townlands of Laughanstown and Brennanstown, Dublin 18. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The site of the proposed development is located in the Cherrywood Planning Scheme area and forms part of Development Area 8 – Tully. The site of the development proposed is generally bound by other lands within Development Area 8 – Tully zoned for education use to the south, Beckett Park to the north and west and Castle Street to the east. Permission is sought for amendments to development permitted under Reg. Ref. DZ23A/0028 consisting of development comprising: the addition of 4no. apartment units (2no. 1 bed and 2 no. 2 bed units) at Level 03 of Apartment Building 1, together with an increase in parapet height (c.800mm) for a section of the Apartment Block to provide a stepped building profile (Apartment Building 1 now 4 storeys overall); 4no. additional car parking spaces, 5no. additional bicycle parking spaces and 1no. additional motorcycle parking space; repositioning of a portion of the attenuation area, together with all ancillary and associated site development works; all on a development tile (T13) of approximately 0.8ha.