在 Laughanstown 建一个排水池,并平整一块未来的学校用地。
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
- 0.95
- 公顷
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
正在从议会网站加载文件…
在 0.95 公顷的场地上建雨水滞留池,并为未来的学校重新平整地面。
滞留池排水到 Ticknick 溪。一个临时水池将被填平,新建一条排水管服务 Beckett Park 排水系统。设绿化和座椅。
由 AI 根据议会的描述撰写。以文件为准。
Permission for: The construction of an attenuation pond (detention basin) with associated outfall to Ticknick stream, infilling of the existing temporary attenuation pond (north of Mercer Link Road, constructed as part of the Phase 1 Roads and Infrastructure works permitted under Reg. Ref. DZ15A/0758), construction of a new stormwater outfall pipe from Beckett Park attenuation system to Ticknick stream (granted under Ref. Ref. DZ15A/0814) and regrading of the site levels to facilitate the fut...
Permission for: The construction of an attenuation pond (detention basin) with associated outfall to Ticknick stream, infilling of the existing temporary attenuation pond (north of Mercer Link Road, constructed as part of the Phase 1 Roads and Infrastructure works permitted under Reg. Ref. DZ15A/0758), construction of a new stormwater outfall pipe from Beckett Park attenuation system to Ticknick stream (granted under Ref. Ref. DZ15A/0814) and regrading of the site levels to facilitate the future development of this school plot (subject to separate future planning application). The proposed works include all associated infrastructure connections, hard and soft landscaping with seating, boundary treatments and all associated ancillary and site development works. This application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as Amended.